Laserfiche WebLink
Quality Code Data 11/28/2016, Page 5 <br />(d) The City reserves the right to make an additional connection capacity fee assessment for an existing sewer connection if the peak month flow or strength of discharge is increased above that flow or strength upon which the original connection capacity fee was based. <br />(e) Connection Capacity fee receipts shall be deposited into a separate reserve account to be used for future treatment facility expansion projects, or if no future expansion is required, <br />these funds may be used to finance other treatment facility improvement projects or to retire the General State Revolving Fund Loan. <br />(f) Each sewer permit issued as herein provided, and the right to a sewer connection pursuant to any such sewer permit so issued, shall run with the land, and shall not be transferred to, or used for, any other property other than the property for which the sewer <br />permit was originally issued. <br />(g) All sewer rates, charges, and fees as herein provided shall be non-refundable. <br />(h) Reference is made to the City’s “Procedures and Policies for Sewer Connection Fees” on file with the City Clerk and incorporated herein by this reference. <br />(ih) The Sanitary Sewer Connection Capacity Fee shall be modified each July 1st by an amount less than or equal to either the amount shown in the Wastewater Capacity <br />Charge Study (2010) or the percentage change in the Consumer Price Index (CPI) for the San Francisco Bay Area as published by United States Department of Labor Bureau of Labor Statistics from the preceding one-year period, whichever is greater. <br />§12.5.120: WASTEWATER DISCHARGE PERMITS. <br />(a) Reference is made to the Title 3, Chapter 14, Uniform Wastewater Discharge Regulations, of the San Leandro Municipal Code. All references herein to “Regulations” shall be to the aforementioned regulations. <br />(b) The Regulations require that Major Contributing Industries, as defined in Section 3-14-200 of the Regulations, connected to or discharging into the City sewer must obtain a Pretreatment Permit. <br />(c) Section 3-14-520 of the Regulations lists standard permit conditions. <br />(d) Applications for the Pretreatment Permit will be kept on file by the City. Major Contributing Users shall be issued a permit upon completion of the application. <br />(e) Upon receipt of the completed application, City staff will schedule an inspection of each applicant’s facility. This will verify and complete the information provided on the application. <br />(f) Upon issuance or renewal of the permit, a permit fee as set forth in San Leandro Administrative Code § 6.4.100 shall be charged. <br />90