My WebLink
|
Help
|
About
|
Sign Out
Home
4B Presentation Shoreline Update 4-3-17
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0403
>
4B Presentation Shoreline Update 4-3-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 3:57:08 PM
Creation date
4/6/2017 3:57:07 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/3/2017
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1.Surcharge Program <br />•Infeasible <br />2.Steel Sheet Pile Wall <br />•$2,000 / linear foot ~ = $17.2 MM <br />3.Cantilevered Wall on Concrete Pier Foundation <br />•$1,500 / linear foot ~ = $12.9 MM <br />4.Drilled Displacement Piles (buildings only) <br />•$935 / linear foot ~ = $8.1 MM <br />5.Deep Soil Mixing <br />•$700 / linear foot ~ = $6.0 MM <br />•Will allow for more cost-effective sea wall option (Keystone wall, CMU wall, or similar) <br />•250,000 cubic yards of import still required ~ = $6MM <br />•Total Deep Soil Mixing = + $12MM <br />Monarch Bay Shoreline Development Geotechnical Mitigation Measures -Costs <br />10
The URL can be used to link to this page
Your browser does not support the video tag.