My WebLink
|
Help
|
About
|
Sign Out
Home
4B Presentation Shoreline Update 4-3-17
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0403
>
4B Presentation Shoreline Update 4-3-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2017 3:57:08 PM
Creation date
4/6/2017 3:57:07 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/3/2017
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Ratio of shear strength resistance / mobilized shear stress (from gravity, surcharge, earthquake shaking, etc) <br />Static and seismic loading <br />Target Factors of Safety <br />–1.5 and 1.0 RESULTS: <br />•Proposed Development required to satisfy BCDC Sea Level Rise Guidelines for 2100 Upper Bound (66”) <br />–Static: < 1.5 <br />–Seismic: < 1.0 <br />Conclusion: Geotechnical mitigation needed for development, based on existing and proposed grades. <br />Outer and inner basin stability, ~8,600 linear feet <br />Monarch Bay Shoreline Development Slope Stability <br />8
The URL can be used to link to this page
Your browser does not support the video tag.