Laserfiche WebLink
Current FeeDescriptionProposed Fee ScheduleReferenceCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)Proposed Fees8MiscellaneousA. Inspection FeesFees for inspection not otherwise set forth hereinDirect Cost (1)Courtesy Inspection for projects that are awaiting permit issuance pending completion of plan review Fees for inspection conducted outside of normal business hoursB. Extra Inspection Fees(1) Deficient or defective work, or otherwise through fault or error on the part of the holder of permit or his/her employeesOne inspection made under the regular fees as provided hereinEach and every further extra inspection visitDirect Cost (1) with a minimum of one hour(2) Incorrect Address or location of workDirect Cost (1) with a minimum of one-half hour(3) Amending application to increase the number of devices authorized for installation or repair after permit has been issued and before any inspection of work is made:Fees as stated herein for additional installations(4) Investigation fee for work commenced without first obtaining permits as required by the San Leandro Municipal Code, whether or not a permit is subsequently issued(5) Code Compliance Inspections at the request of the property owner.Direct Cost (1) with a minimum of one hour(6) Investigation Fee for conditions that are not in compliance with the San Leandro Zoning and/or Municipal CodesDirect Cost(1)C. Other Fees and ChargesAutomation Update Fee6% of Permit Fee, Minimum $6.20 per permit typeStrong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic monitoring. Collected for the State by the City.Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards collected for the State by the City.Exception to Noise Ordinance$448.00Certificate of OccupancyDirect Costs (1) , with minimum of $151.00Temporary Certificate of Occupancy per 30 daysDirect Costs (1) , with minimum of $151.00Certificate of Compliance:Direct Costs (1) , with minimum of $151.00Single-family dwellingDirect Costs (1) , with minimum of $151.00Two-family dwellingDirect Costs (1) , with minimum of $151.00All othersDirect Costs (1) , with minimum of $151.00House Moving PermitDirect Costs (1) plus mileage, with minimum of $151.00File retrieval and refiling (no staff assistance)$7.60Microfilm Copies$1.20Photocopies$0.10 per pageStaff assistance with file contentsDirect Costs (1)Microfilming of Permit and Plans includes imaging fee for fire permits: (For purposes of fee charges, each permit is considered a drawing)8-1/2 x 11 or 11 x 14 drawings including fire permits$ 1.90 per sheetAll other size drawings$ 2.10 per sheetAppealsDirect Costs (1)D. Fire Permit Filing and Issuance Fee$100.00 plus applicable fees from the Fire Dept. Fee Section(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costsRate equal to 1.5 times the Direct Cost (1) with a minimum fee of two Residential: .0010 per $10.00 Valuation or fraction thereof with a $0.50 min. Commercial:/Industrial: .0021 per $10.00 Valuation or fraction thereof with a $.50 min.Note: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the execution of the work nor from any other penalties prescribed by law.All Residential, Commercial, and Industrial permits that use Valuation to determine permit fees: $1.00 per $25,000 valuation or fraction thereof with a $1.00 minimum.Fee equal to three (3) times the minimum fees PLUS any required permit fee$269 for inspections during normal business hours and $393 for inspections outside normal business hours 1027