My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent Calendar 2017 0501
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0501
>
8I Consent Calendar 2017 0501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 4:18:54 PM
Creation date
4/25/2017 4:16:42 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/1/2017
Retention
PERM
Document Relationships
Reso 2017-067
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-174 <br />Previously Completed Conduit Installations through a Separate Contract <br />$2,104,909.35 <br />Design, Bid and Award $ 46,812.00 <br />Cost of this Contract $ 427,830.00 <br />Construction Management, Inspection, and Contingency $ 136,122.50 <br />Total Estimated Cost of Project $2,715,673.85 <br />The subject contract is in the amount of $ 427,830.00. If change orders are needed, the <br />maximum authorized total contract amount by this action is $534,787.50. Change orders that <br />increase the project cost beyond the budget authority will not be issued without Council <br />approval of an additional appropriation. <br />Budget Authority <br />The funding for the entire project is as follows: <br />Account No. Source. & Approp. Date Approp. Amount Funds Available <br />150-38-347 EDA Grant, FY 2012-13 $2,121,000.00 $ 133,000.00 <br />120-38-347 DFSI, FY 2012-13 $ 150,000.00 $ 0.00 <br />210-38-347 CIP Fund, FY 2012-13 $ 352,000.00 $ 336,000.00 <br />120-28-196 DFSI, FY 2016-17 $ 491,000.00 $ 491,000.00 <br /> Subtotal $3,114,000.00 $ 960,000.00 <br />ATTACHMENTS <br />·Bid Summary - Fiber Conduit Network Extension Project <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 4/24/2017 <br />138
The URL can be used to link to this page
Your browser does not support the video tag.