Laserfiche WebLink
Description Current Fee Reference <br />Proposed Fee Schedule <br />COMMUNITY DEVELOPMENT DEPARTMENT -Building Regulations Division (continued) <br />Proposed Fees <br />wrdddd Photovoltaic Systems <br />Losidenddad <br />ddd each additional MW over 15MW <br />1 <br />d c niniercrd d <br />dd Up to 251ddt <br />$400 <br />ddd 6dd8fi/.. 0dddt <br />$623 <br />dddd each additional kW (51kW 150MW) <br />7 <br />ddd each additional MW over 250k <br />dldc gz. For photovoltaic systems, dated pzdddadd foes, including applicable axxddaad'd Issuanc e and Ld'dd'ng Fees, Automation Fees, <br />Community Planning Fees, and oohed mandated foss shall not exceed amounts authorized viaccverndent Code Sec son df6015, <br />d'afda permit foss are based on all signs fdsing on the same property <br />and on the same pemih, <br />dUcn energized sign attached to building, <br />ffdfd <br />each additional sign thereafter,, <br />0 <br />c) Pylon sd'afda energized or not each: <br />211 <br />dfd dN c aadad ent sign, energized or dead,, each <br />..W <br />$158 <br />�4 f�elocrsfd'ccn or alteration of any sign electronically or <br />79 <br />mechanically, but not including replacement of emtding, <br />transformers and such parts subject to f d'ddare, or shop <br />inspection by the local inspection dfopartment in lieu of a UL deeded <br />(e local electrical inspection dfopartment deeded of approval shall be <br />required), sande <br />xd Demolition <br />ccdaadaaercdal/Fxsd'd en d l Demolition dais to 3,OOOSF <br />267 <br />�ecfd Additional 10tdtOSF <br />$178 <br />Plan daecdddng Lee <br />xden c hecrdddng fee shall be paid at the td'ddae of apfddd'c ation for e building <br />pemad't. Eche plan c hecrdddng fee is in addition to the building pemad't fee <br />and sdaedd be as follows: <br />del Plan Check Lee, if applicable.. <br />80 of building pemadd fee <br />d'dd For Master Plans (i, e, identical buildings tddad'dt by the same builder <br />A fdadd plan cher dbdng fee shall be paid for <br />on the same lot or in the same tract and for which building permits <br />sande MasterPlan when more than one <br />are issued at the same td'ddaed <br />building ddad'dd be tddad'dt and one third (331%) <br />of the tdadd plan checrdddng tee shall be <br />paid for sande production phase building <br />at td'ddae ofapplication, <br />ddld Changes, revisions, or additions to plans previously checked <br />$178 per daour,1 hour daaddaddaium charge <br />dwrd Additional plan review after the first ro chec,dd..., <br />178 per deader, t flour ddaddaddaium charge <br />d �ddemate Methods and Materials <br />178 per deader, t hour daadaddaium charge <br />del daergy Conservation for all buildings and projects subject to the <br />20 of building pemadd tee <br />