My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2017 GHD Services Inc.
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2017
>
Agmt 2017 GHD Services Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 4:20:38 PM
Creation date
5/8/2017 4:20:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/6/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0306 CS + RG
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0306
8J Consent 2017 0306
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0306
Agmt 2017 Amend No. 1 GHD Services Inc.
(Amended by)
Path:
\City Clerk\City Council\Agreements\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Project Experience <br /> GHD is uniquely qualified to assist the City of San Leandro with the engineering and professional services <br /> relating to the decommissioning and demolition requirements needed at the San Leandro Marina due to our <br /> extensive experience and knowledge. In regards to our technical capabilities related to this project, GHD <br /> has been providing demolition and decommissioning services to Fortune 500 companies throughout North <br /> America and Europe for over 20 years; we are a key leader in this market sector. GHD has completed <br /> decommissioning and demolition evaluation related services of over one billion square feet of property. <br /> Our San Francisco Bay Area offices are well equipped to provide effective local knowledge, management <br /> and technical support on this project as demonstrated by our recent work for the City of San Francisco. <br /> Current or past similar decommissioning and demolition projects are the San Francisco Marina West <br /> Harbor Renovation Project(consolidated design package for the waterside improvements), Argo Solvents <br /> Plant and Barge Dock Facility Decommissioning project(bid documents and contract administration and <br /> direct demolition contractor management), and Morton Newark Salt Plant Decommissioning project <br /> (decommissioning assessment and compliance review, specifications and contractor procurement <br /> assistance). <br /> 4. Scope of Work <br /> 4.1 Marina Facilities Decommissioning Assessment <br /> GHD will conduct the necessary field investigation and engineering activities required to evaluate <br /> observable physical and environmental conditions of the facilities to provide for the development of a <br /> Decommissioning and Demolition Plan. A physical inventory of marina facilities will be prepared including <br /> floating docks, fixed piers, buildings on fixed piers, subsurface support structures, utilities, harbor masters <br /> office and a limited amount of rock revetment or rip-rap. Field investigation will require access to buildings <br /> and improvements by GHD field engineers for a minimum of two days. Documentation of existing utility <br /> components (water, electrical, sewer and/or communications)will be included in the inventory. A table and <br /> drawing will be prepared identifying quantities of materials that will be demolished, recycled, sold or reused. <br /> Existing as built engineering drawings provided by the City of San Leandro DPW will be reviewed as a <br /> component of the Marina Facilities Decommissioning Assessment to identify construction methods and <br /> materials of existing marina appurtenances. <br /> A Hazardous Materials survey will be conducted to identify and quantify potential hazardous materials <br /> associated with the marina facilities including fluorescent light fixtures, mercury-containing equipment, <br /> battery devices, creosote pilings and potential lead and asbestos containing materials. The Hazardous <br /> Materials survey will identify sample locations and parameters that may include polychlorinated biphenyls <br /> (PCBs), total Resource Conservation and Recovery Act(RCRA) metals, RCRA semi-volatile organic <br /> compounds (SVOCs) and RCRA volatile organic compounds (VOCs). Photo documentation will be <br /> completed as part of this task, in a format acceptable to DPW. GHD will prepare a Health and Safety Plan <br /> (HASP) to address project-specific hazards associated with completing the scope of work outlined in this <br /> section. <br /> Consulting Services Agreement between City of San Leandro and GHD Services, Inc. March 6, 2017 <br /> Exhibit A—Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.