My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-076
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:53:52 PM
Creation date
6/12/2017 12:04:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
6/5/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0605 CS + JointSpecial RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0605
8I Consent Calendar 2017 0605
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T'DA Article 3 Project, Application Form <br />Fiscal Year of this Cl4m: FY 2017/18 Appl�icant: City of San Leandro <br />Contact person,�� Michae�l Stella, P.E., Principal Engineer <br />Mailing Addiress: 835 E. 14M Street, San Leandro, CA 94577 <br />E -Mail Address: mste�la2san1eaindiro.orq Te�ephonel 510-577-3433 <br />Secondary Contact �in event primary not a4lable� Keith, Cooke, Director of Engineering & Transportation <br />E -Mail Address: kcookeasanileandro.org Telephone� 510-577-3439 <br />Short Title Description of Project: AnnUal Street Sealing Piro�eict <br />Amount of c�iaim: $82.700 <br />Functional Description ofProject: <br />The pro'ect will provide for the design, procurement, and construction of curb ramps, sidewalk, and sim�lair pedestrian safety features at various <br />ocations throughout the City. <br />Financial Plan: <br />List the project elements for which TDA funding is being irequested (e.g., planniing, engineering, construction, contingency). Use the table below bm <br />show the project budget for the phase being funded or total project, Include prior and proposed fUtUre funding of the project. Planmin0funds may <br />Project Elements: <br />Project Eligibility: <br />YESTNO? <br />A. <br />Has the project been, approved by the claimant's governing body? (If "NO," provide the approximate date approval is <br />Yes <br />B. <br />Has this pirqeict previously received TDA Article 3 funding? If "YES," provide an, explanation on a separate page. <br />Yes <br />C. <br />For "bikeways," does the pirqeict meet Caltrains miniMUM safety design criteria pursuant to Chapter 1000 of the California <br />N/A <br />Highway Design Manual? (Available on the internet via: http://www dot.ca.glo ). <br />D. <br />Has the project been, reviewed by a Bicycle Advisory Committee (BAC)? (I f "NO," provide an, exp�ianiation), Enter date the <br />Yes <br />project was rev�iewed by the BAC, February 23, 2017 (San Leandro Bicycle Pedestrian Advisory Committee) <br />E. <br />Has the )Ubl�c availabi�iity of the environmental comp�iiainice documentation for the project (piursuant to CEQA) been <br />Pirqeict is <br />evidenced by the dated stamping of the document by the COUnty clerk oir county recorder? (requ�ired only for projects that <br />Categorically <br />include construction), <br />Exempt <br />F. <br />VWI the project be completed before the allocation expires? Enter the anticipated completion date of project (month and <br />Yes <br />year) June 30, 2018 <br />G <br />Have provisions been made by the claimant to maintain the project or fa6ity, or has the claimant arranged for suich <br />Yes <br />ntenance by another agency? (If an agency other than the Claimant is to maintain the fa6ity provide its name: <br />
The URL can be used to link to this page
Your browser does not support the video tag.