Laserfiche WebLink
<br />Recommended Conditions of Approval July 17, 2017 <br />PLN16-0067 Page 11 of 13 <br /> <br />IX. FENCING AND SCREENING REQUIREMENTS <br /> <br />A. All fencing and walls on the project site shall be structurally sound, graffiti-free and well <br />maintained at all times. <br /> <br />B. Barbed or razor wire shall not be installed on any fence, wall or building on the project <br />site. <br /> <br />C. Electrical transformers shall be vaulted underground. In the event that the transformer <br />cannot be undergrounded, it shall be screened from view consistent with the access <br />requirements of PG&E. Details for screening shall be subject to the review and approval <br />of the Community Development Director. <br /> <br />D. All walls, fences, and landscaping within 25 feet of any street intersection or driveway <br />shall be maintained at a height of not more than 36 inches above the top of the nearest <br />adjacent curb and gutter to allow for adequate sight distance, or unless otherwise <br />approved by the City’s Transportation Engineer. <br /> <br />X. MAINTENANCE <br /> <br />A. The project site shall be well maintained and shall be kept free of litter, debris and weeds at <br />all times; during construction, the site shall be well maintained and shall be kept free of <br />litter, debris and weeds. <br /> <br />B. Any graffiti shall be promptly removed from building walls, perimeter soundwalls and/or <br />fences. The developer and its successors in interest shall comply with the rules and <br />regulations of the City’s graffiti removal program and shall grant a license and right of <br />entry as requested to enforce the terms of such program. <br /> <br />C. All landscaping improvements shall be maintained in a healthy, growing condition at all <br />times. <br /> <br />D. During the construction phase, the site shall be enclosed with a security fence and shall be <br />well maintained in a neat manner, free of weeds, litter and debris. <br /> <br />XI. CONSTRUCTION PROVISIONS <br /> <br />A. Pest and vermin control shall be instituted prior to the demolition and/or grading of the <br />project. <br /> <br />B. Construction on the project site shall not commence prior to 7:00 a.m. and shall cease by <br />7:00 p.m., Monday through Friday, and shall not commence prior to 8 a.m. and shall <br />cease by 7 p.m. Saturday and Sunday, unless otherwise approved by the Chief Building <br />Official. There shall be no construction on Federal holidays. Interior construction such as <br />sheet rock taping and texturing, painting, tile installation and similar activity shall be <br />permitted outside the above hours provided that construction noise shall not be detectable <br />outside of the buildings under construction or renovation. <br /> <br />194