My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2017 0717
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0717
>
5A Public Hearings 2017 0717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 5:40:18 PM
Creation date
7/13/2017 5:39:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
Reso 2017-096
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF SAN LEANDRO <br />RE: Exhibit A -CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN16-0067) <br />JULY 17, 2017 <br />Page 11 <br /> <br />Table 3: Relevant Potential Project Impacts and General Plan EIR Mitigation Measures <br />Potential Impact 2002 General Plan Policies/Mitigation <br />Measures* and 2007 TOD Strategy EIR <br />Mitigation Measures <br />Corresponding 2016 General Plan <br />Policies/Mitigation Measures <br />Compliance <br />Implementation of <br />the TOD Strategy <br />could result in <br />significant impacts <br />related to expansive <br />soils. <br />engineering and building standards, <br />should ensure that new construction is <br />designed to minimize the potential for <br />damage. <br />review process, and its engineering and <br />building standards, should ensure that <br />new construction is designed to <br />minimize the potential for damage. <br /> General Plan Action EH-1.1.A: <br />Require soils and/or geologic <br />reports for development in <br />areas where potentially serious <br />geologic risks exist. These <br />reports should address the <br />degree of hazard, design <br />parameters for the project <br />based on the hazard, and <br />appropriate mitigation <br />measures. <br />minimize risks based on <br />hazards. The project would <br />be required to comply with <br />the recommendations <br />outlined in the geotechnical <br />report, as a condition of <br />approval, for soil subgrade <br />preparation, soil subgrade <br />stabilization, utility trench <br />backfill, exterior flatwork <br />subgrade preparation, vapor <br />retarder, pavement design, <br />rigid pavement, and non- <br />vehicular concrete pavers, <br />and seismic design. <br />Hazards and Hazardous Resources <br />Implementation of <br />the TOD Strategy <br />could result in <br />significant impacts <br />through the routine <br />transport, use, or <br />disposal of <br />hazardous materials <br />or through the <br />release of hazardous <br />materials into the <br />environment. <br />General Plan Policy 33.01: Work with <br />the appropriate county, regional, state, <br />and federal agencies to develop and <br />implement programs for hazardous <br />waste reduction, hazardous material <br />facility siting, hazardous waste handling <br />and disposal, public education, and <br />regulatory compliance. <br />General Plan Policy EH-5.1: Work with <br />the appropriate county, regional, state, <br />and federal agencies to develop and <br />implement programs for hazardous <br />waste reduction, hazardous material <br />facility siting, hazardous waste handling <br />and disposal, public education, and <br />regulatory compliance. <br />The project would comply <br />with Policy EH-5.1 to reduce <br />project impacts. See the <br />Hazards and Hazardous <br />Resources discussion below. <br />The project would dispose of <br />hazardous materials as <br />required by all appropriate <br />agencies. <br />General Plan Policy 33.02: Ensure that <br />the necessary steps are taken to clean <br />up residual hazardous wastes on any <br />contaminated sites proposed for <br />redevelopment or reuse. <br />General Plan Policy EH-5.2: Ensure that <br />the necessary steps are taken to clean up <br />residual hazardous wastes on any <br />contaminated sites proposed for <br />redevelopment or reuse. Require soil <br />evaluations as needed to ensure that <br />risks are assessed and appropriate <br />remediation is provided. <br />The project would comply <br />with Policy EH-5.2 to reduce <br />project impacts. See the <br />Hazards and Hazardous <br />Resources discussion below. <br />The project would dispose of <br />hazardous materials as <br />required by all appropriate <br />agencies. <br />General Plan Policy 33.03: Require that <br />all hazardous material storage and <br />handling areas are designed to minimize <br />the possibility of environmental <br />contamination and adverse off-site <br />impacts. <br />General Plan Policy EH-5.3: Require <br />that all hazardous material storage and <br />handling areas are designed to minimize <br />the possibility of environmental <br />contamination and adverse off-site <br />impacts. Enforce and implement <br />relevant state and federal codes <br />The project would <br />implement Policy EH-5.3 to <br />reduce project impacts. See <br />the Hazards and Hazardous <br />Resources discussion below. <br />The project would dispose of <br />hazardous materials as <br />157
The URL can be used to link to this page
Your browser does not support the video tag.