Laserfiche WebLink
CITY OF SAN LEANDRO <br />RE: Exhibit A -CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN16-0067) <br />JULY 17, 2017 <br />Page 19 <br /> <br />Operational Air Quality Impacts <br />Long-term air pollutant emissions generated by a residential and commercial development are typically <br />associated with the burning of fossil fuels in cars (mobile sources); energy use for cooling, heating, and <br />manufacturing (energy); and landscape equipment (area sources). The primary source of long-term <br />criteria air pollutant emissions generated by the proposed project would be emissions produced from <br />project-generated vehicle trips. <br />As shown in Table 6, below, operation of total SLTC development would generate air pollutant <br />emissions. Projected emissions resulting from the SLTC buildout fall below the operational significance <br />thresholds developed by the BAAQMD. <br />Table 6 <br />Maximum Daily Operational Emissions Summary (Pounds per Day) <br />Operation ROG NOx Total PM10 Total PM2.5 CO <br />Summer <br />Area Source 5.68 0.76 0.14 0.14 16.58 <br />Energy 0.08 0.67 .05 0.05 0.32 <br />Mobile 1.87 10.02 4.36 0.08 18.61 <br />Total 7.63 11.45 4.55 0.27 35.51 <br />Winter <br />Area Source 5.68 0.76 4.55 1.41 36.00 <br />Energy 0.08 0.67 0.05 0.05 0.32 <br />Mobile 1.64 10.45 0.08 1.22 19.09 <br />Total 7.40 11.88 4.68 2.68 55.41 <br />Thresholds <br />BAAQMD Potentially <br />Significant Impact <br />Threshold <br />54 54 82 54 - <br />Exceed BAAQMD <br />Threshold? No No No No N/A <br />Source: CalEEMod version 2016.3.1. See Appendix A for emission model outputs. <br />The project would represents only a fraction of the total SLTC buildout and therefore would also not <br />exceed BAAQMD thresholds. The project would not exceed the buildout proposed in the TOD Strategy <br />and analyzed in the TOD Strategy EIR. The TOD Strategy EIR found that operational-related impacts for <br />TOD Strategy buildout would be less than significant. No further analysis is needed, and the project <br />would be consistent with the City’s TOD Strategy EIR. <br /> <br />165