Laserfiche WebLink
OPINION OF PROBABLE COSTS <br />Root Park Bocce Court <br />Abey Arnold Associates, Landscape Architects <br />5/24/17 <br />SLIA <br />Item # ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL PRICE <br />1 Mobilization, (tree protection, temp fence)1 Lump $5,000.00 $5,000.00 <br />Demolition <br />2 Irrigation Removal 0 SF $2.00 $0.00 <br />3 Tree/Landscape Removal 0 SF $2.00 $0.00 <br />4 Sawcutting 1 Lump $500.00 $500.00 <br />5 Paving removal 500 SF $4.00 $2,000.00 <br />6 Site Furnishing removal/salvage 3 Picnic tables 0 Lump $500.00 $0.00 <br />Storm Drainage <br />7 Drainline, 4" diam.14 L.F. $20.00 $280.00 <br />8 4" Perforated Drainline 70 L.F. $30.00 $2,100.00 <br />9 Slot Drain at bocce court perimeter 180 L.F. $20.00 $3,600.00 <br />10 Area Drain - Square v-12 2 EA $800.00 $1,600.00 <br />11 Clean Out 1 EA $200.00 $200.00 <br />Concrete Work <br />12 Concrete Paving- Grey (2 lb lamp black/ CY) 700 S.F. $12.00 $8,400.00 <br />13 ADA Ramp at Bocce 1 EA. $2,500.00 $2,500.00 <br />14 Oyster Shell surface with Class2 Perm Base 700 S.F. $10.00 $7,000.00 <br />16 6" Concrete Curb at Court 90 L.F. $40.00 $3,600.00 <br />17 12" Concrete Perimeter Curb (match planter walls) 104 L.F. $90.00 $9,360.00 <br />Metal Fabrication <br />18 ADA Bocce Court Access Gate w/ hardware 1 EA. $2,500.00 $2,500.00 <br />19 Reinstall existing metail railing 113 L.F. $50.00 $5,650.00 <br />20 36" Height Tube Steel Fencing (Match exist.) 85 L.F. $150.00 $12,750.00 <br />21 Handrails at Bocce Courts 2 EA. $400.00 $800.00 <br />Subtotal $67,840.00 <br />10% Contingency: $6,784.00 <br />Grand Total $74,624.00 <br />CITY OF SAN LEANDRO <br />1 Irrigation Removal 600 SF $2.00 $1,200.00 <br />2 Tree/Landscape Removal 600 SF $3.00 $1,800.00 <br />3 Paving removal 260 SF $4.00 $1,040.00 <br />4 Site Furnishing removal/salvage 3 Picnic tables 1 Lump $500.00 $500.00 <br />5 Asphalt Paving at ADA Parking 260 S.F. $10.00 $2,600.00 <br />6 Benches- reinstall existing 6' benches 4 EA. $400.00 $1,600.00 <br />7 Trash Receptacles- reuse existing 2 EA. $300.00 $600.00 <br />8 New Irrigation 475 S.F. $2.50 $1,187.50 <br />9 Soil Preparation at Planting areas 475 S.F. $0.30 $142.50 <br />10 24" Box Trees 3 EA. $300.00 $900.00 <br />11 Planting- 1 gallon shrubs 50 EA. $12.00 $600.00 <br />12 Mulch 5 C.Y. $85.00 $425.00 <br />13 Landscape Maintenance- 90 days 1 L.S. $1,500.00 $1,500.00 <br />City Subtotal $14,095.00 <br />1 Of 2266