Laserfiche WebLink
Non-Professional Services Agreement between July 1st, 2017City of San Leandro and Priority 1 PSE Page 4 of 15 <br />vehicle, per day, is a reasonable estimate that may be imposed if Contractor fails to meet the deadlines or schedules for the repair and return of operable vehicles as required by the City. <br />Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Contractor shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this Agreement. City shall make available to Contractor only the facilities and equipment listed in this section, and only under the terms and conditions set forth herein. Contractor shall make a written request to City to use facilities or equipment not otherwise listed herein. <br />3.1 Safety Requirements. In accordance with generally accepted construction practices and state law, Contractor shall be solely and completely responsible for conditions on the jobsite, including safety of all persons and property during performance of the work. This requirement shall apply continuously and not be limited to normal working hours. <br />Contractor shall take all necessary precautions and provide all necessary safeguards to prevent personal injury and property damage. Contractor shall provide protection for all persons including, but not limited to, its employees and employees of its subcontractors; members of the public; and employees, agents, and representatives of the City and regulatory agencies that may be on or about the work. <br />The services of the City in conducting review and inspection of Contractor's performance is not intended to include review of the adequacy of Contractor's work methods, equipment, bracing or scaffolding, or safety measures, in, on, or near any Contractor jobsite. <br />All work and materials shall be in strict accordance with all applicable state, city, county, and federal rules, regulations and codes, with specific attention to the United States Department of Labor Occupational Health and Safety Administration (OSHA) requirements. Contractor shall be solely responsible for compliance with all city, county, and state explosive transport, storage, and blasting requirements and for any damages caused by such operations. <br />Contractor is hereby informed that work on City property could be hazardous. Contractor shall carefully instruct all personnel working on City property that all conditions of the property are potentially hazardous work areas as to potential dangers and shall provide such necessary safety equipment and instructions as are necessary to prevent injury to personnel and damage to property. Special care shall be exercised relative to work underground. <br />In addition to complying with all other safety regulations, Contractor shall abide by any and all other City requirements contained in any specifications, special conditions or manuals, which shall be made available by City upon request. <br />Contractor shall provide and maintain all necessary safety equipment such as fences, barriers, signs, lights, walkways, guards, and fire prevention and fire-fighting equipment and shall take such other action as is required to fulfill its obligations under this section. It <br />335