My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent Calendar 2017 0717
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0717
>
8M Consent Calendar 2017 0717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 5:40:36 PM
Creation date
7/13/2017 5:40:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
Reso 2017-108
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-398 <br />o Policy T-5.3: Maintenance. <br />·Goal T-6: Minimize the adverse effects of business, industrial, and through traffic on <br />neighborhood streets. <br />·Goal T-7: Improve traffic safety and reduce the potential for accidents on San Leandro <br />streets. <br />o Policy T-7.2: Capital Improvements. <br />§Action T-7.2B: Pedestrian Safety Improvements. <br />Environmental Review <br />A review of the California Environmental Quality Act (CEQA) will be completed during the <br />design of the project. Staff anticipates that Annual Overlay/Rehabilitation project will be <br />categorically exempt but the project will include mitigation measures should they be required. <br />The approval of this contract is itself exempt from CEQA as not having a significant effect on <br />the environment. <br />Fiscal Impacts <br />The total project is estimated to cost $8,635,000 including design, construction, inspection, <br />and contingency. The cost of this consulting services agreement will not exceed $700,000. If <br />change orders are necessary, they will not exceed $70,000 individually or $175,000 <br />cumulatively without City Council approval. <br />Budget Authority <br />The project is funded as follows: <br />Account No. Reso, Appropriation Dates & Source Amount <br />141-38-392 FY 2017-18 Budget, Measure B and BB $1,500,000 <br />141-39-392 FY 2017-18 Budget, Measure BB Grant $6,000,000 <br />142-38-392 FY 2017-18 Budget, Gas Tax $ 185,000 <br />143-38-392 FY 2017-18 Budget, Measure F (VRF)$ 950,000 <br />Total $8,635,000 <br />Attachment(s) to Staff Report <br />List of Streets 17-18 Overlay <br />PREPARED BY: Ingrid Lin, Associate Engineer, Engineering and Transportation <br />Page 3 City of San Leandro Printed on 7/11/2017 <br />470
The URL can be used to link to this page
Your browser does not support the video tag.