Laserfiche WebLink
T. The project creates or replaces 5,000 square feet of impervious surface for a "retail <br /> gasoline outlet", thus it is considered a Regulated Project according to Provision C.3.b <br /> of the San Francisco Bay Region Municipal Regional Stormwater NPDES Permit <br /> (Order No. R2-2015-0049, NPDES Permit No. CAS612008, adopted 11/19/2015). The <br /> Regulated project shall provide the following documentation as part of the Planning <br /> application. The following resources will assist the applicant in complying with these <br /> requirements: <br /> 1. Download the C3 Stormwater Technical Guidance at <br /> http://www.cleanwaterprogram.org/business/development.html <br /> 2. Fill-out the Planning Permit Submittal Checklist in Table 3-1 of the Guidebook and <br /> submit it to Engineering & Transportation. <br /> 3. Add information from the upper portion of Table 3-1 onto the Project Drawings. <br /> 4. Complete the Stormwater Requirements Form (Stormwater Requirements Checklist, <br /> Municipal Regional Stormwater Permit (MRP 2.0), Stormwater Controls for <br /> Development Projects). <br /> 5. Fill-out the "C3 Sizing Calculator — Volume" available at <br /> http://www.cleanwaterprogram.org/c3-popular-files.html?view=item <br /> 6. Preliminary C3 Stormwater Management Plan shall be modified to show the drainage <br /> management areas for each bio-retention area and the connection of perforated <br /> underdrain pipes to existing storm drain inlet on Lewelling Boulevard. <br /> VII. ENVIRONMENTAL SERVICES REQUIREMENTS <br /> A. The Applicant shall have a current Hazardous Materials Business Plan (HMBP) and be <br /> in compliance with all applicable Federal, State and local Underground Storage Tank <br /> (UST) codes and regulations. <br /> B. Applicant will investigate the cause of water intrusion in the UST annular spaces. If <br /> water intrusion is due to the annular space risers, applicant shall replace risers on all <br /> USTs as part of the UST fueling system upgrade. <br /> C. Applicant shall notify the Alameda County Environmental Health, Local Oversight <br /> Program, prior to site development, per the post-closure site management requirements <br /> for Fuel Leak Case #R00000309 (closed on December 2, 2014). <br /> D. A UST Installation/Modification Application shall accompany the construction permit <br /> application. The application is available from the City of San Leandro Environmental <br /> Services Section. <br /> Agreement to Conditions November 18,2016 <br /> PLN16-0030 Page 10 of 14 <br />