Laserfiche WebLink
XII. CONSTRUCTION PROVISIONS <br /> A. Construction on the project site shall not commence prior to 7:00 a.m. and shall cease <br /> by 7:00 p.m., Monday through Friday, and shall not commence prior to 8:00 a.m. and <br /> shall cease by 7:00 p.m. Saturday and Sunday, unless otherwise approved by the Chief <br /> Building Official. There shall be no construction on Federal holidays. As provided in <br /> this City of San Leandro's Noise Ordinance (ORDINANCE NO. 2003-005), <br /> "construction" shall mean any site preparation, assembly, erection, substantial repair, <br /> alteration, demolition or similar action, for or on any private property, public or private <br /> right-of-way, streets, structures, utilities, facilities, or other similar property. <br /> Construction activities carried on in violation of this Article may be enforced as <br /> provided in Section 4-11-1130, and may also be enforced by issuance of a stop work <br /> order and/or revocation of any or all permits issued for such construction activity. <br /> B. Construction activity shall not create dust, noise or safety hazards for adjacent <br /> businesses and properties. Dirt and mud shall not be tracked onto Lewelling Boulevard <br /> or Washington Avenue from the project site during construction. Standard construction <br /> dust control procedures, such as wetting, daily roadwashing and other maintenance <br /> functions to control emissions, shall be implemented at all times during outdoor <br /> construction. Dust generating activities such as grading, excavation, paving, etc. shall <br /> be scheduled the early morning and other hours when wind speeds are low. All <br /> construction activities entailing soil disturbance shall cease when winds exceed 30 <br /> miles per hour as an hourly average. <br /> C. The developer shall prepare a construction truck route plan that would restrict trucks to <br /> arterial streets that have sufficient pavement section to bear the heavy truck traffic, <br /> thereby minimizing noise and traffic impacts to the community. The construction truck <br /> route plan shall be reviewed and approved by the City Transportation Engineer prior to <br /> receipt of the grading permit. <br /> D. Procedures with the highest noise potential shall be scheduled for daylight hours, when <br /> ambient noise levels are highest. <br /> E. All construction contracts shall include the following requirements: 1) Unpaved <br /> construction sites shall be sprinkled with water at least twice per day; 2) Trucks hauling <br /> construction materials shall be covered with tarpaulins or other effective covers; 3) <br /> Streets surrounding demolition and construction sites shall be swept at least once per <br /> day; and 4) Paving and planting shall be done as soon as possible. City shall charge <br /> developer, and developer shall pay, for all costs of sweeping city streets in the vicinity <br /> of the project as necessary to control dust and spillage. <br /> XIII. GENERAL CONDITIONS <br /> A. Prior to issuance of building permits, a lighting plan and specific street (interior <br /> driveway) lighting details regarding location, candle power, and light levels (by <br /> submittal of a photometric study) shall be reviewed and approved by the City Engineer <br /> Agreement to Conditions November 18,2016 <br /> PLN16-0030 Page 13 of 14 <br />