My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2017120097
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2017
>
Inst 2017120097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 2:46:30 PM
Creation date
7/17/2017 2:46:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
6/2/2017
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Worksheet for Calculating the Combination Flow and Volume Method <br /> Instructions:After completing Section 1,make a copy of this Excel file for each Drainage Management Area within the project. Enter information specific to the project and <br /> DMA in the cells shaded in yellow. Cells shaded in light blue contain formulas and values that will be automatically calculated. <br /> 1.0 Project Information <br /> 1 1-1 Project Name: 1717 Doolittle Drive The calculations presented here are based on the combination flow and volume <br /> 1-2 City application ID: G15-0006 hydraulic sizing method provided in the Clean Water Program Alameda County C.3 <br /> Technical Guidance,Version 4.0.The steps presented below are explained in Chapter 5, <br /> 1-3 Site Address or APN: 1717 Doolittle Drive Section 5.1 of the guidance manual,applicable portions of which are included in this file, <br /> 1-4 Tract or Parcel Map No: 3236(Bk.66 Pg.72) in the tab called"Guidance from Cha.ter 5". <br /> I/ 1-5 Site Mean Annual Precip.(MAP)' 17.0 Inches <br /> Refer to the Mean Annual Precipitation Map in Appendix D of the C.3 Technical Guidance to determine the MAP,in inches,for the site. Click here for map <br /> 1-6 Applicable Rain Gauge' Oakland <br /> Enter"Oakland Airport"if the site MAP is 16.4 inches or greater. Enter"San Jose"if the site MAP is less than 16.4 inches. <br /> I <br /> MAP adjustment factor is automatically calculated as: 0.93 <br /> (The"Site Mean Annual Precipitation(MAP)"is divided by the MAP for the applicable rain gauge,showin in Table 5.2,below.) <br /> . ,.(;)Calculate Percentage of Impervious Surface for Drainage Management Area(DMA) <br /> 2-1 Name of DMA: DMA 5 <br /> For items 2-2 and 2-3,enter the areas in square feet for each type of surface within the DMA. <br /> Area of surface type within DMA Adjust Pervious Effective Impervious <br /> Type of Surface <br /> (Sq.Ft) Surface Area <br />' 2-2 Impervious surface 78,610 1.0 $f <br /> 2-3 Pervious service 6,490 0.1 <br /> Total DMA Area(square feet). 85,100 <br /> 2-4 Total Effective Impervious Area(EIA) 79,259 Square feet <br /> I3.0 Calculate Unit Basin Storage Volume in Inches <br /> Table 5-2: Unit Basin Storage Volumes(in inches)for 80 Percent Capture Using 48-Hour Drawdowns <br /> Unit Basin Storage Volume(in)for Applicable Runoff Coefficients <br /> I Applicable Rain Gauge Mean Annual Precipitation(in) Coefficient of 1.00 <br /> Oakland Airport 18.35 0.67 <br /> San lose 14.4 0.56 <br /> I3-1 <br /> Unit basin storage volume from Table 5.2: 0.67 Inches <br /> (The coefficient for this method is 1.00,due to the conversion of any landscaping to effective impervious area) <br /> 3-2 Adjusted unit basin storage volume: 0.62 Inches <br /> (The unit basin storage volume is adjusted by applying the MAP adjustment factor.) <br /> I 3-3 Required Capture Volume(in cubic feet): 4,100 Cubic feet <br /> (The adjusted unit basin sizing volume[inches)is multiplied by the size of the DMA and converted to feet) <br /> 4.0 Calculate the Duration of the Rain Event <br /> I 4-1 Rainfall intensity 0.2 Inches per hour <br /> 4-2 Divide Item 3-2 by Item 4-1 3.10 Hours of Rain Event Duration <br /> 5.0 Preliminary Estimate of Surface Area of Treatment Measure AIIIIIMIIIIIIIIIIMIIIIIIIIIIIIIIIIIIIMIIIIII <br /> 5-1 4%of DMA impervious surface 3,170 Square feet <br /> I 5-2 Area 25%smaller than item 5-1 2,378 Square feet <br /> 5-3 Volume of treated runoff for area in <br /> Item 5-2 3,075 Cubic feet(Item 5-2*5 inches per hour*1/12*Item 4-2) <br /> 6.0 Initial Adjustment of Depth of Surface Ponding Area ,,, <br /> 6-1 Subtract Item 5-3 from Item 3-3 1,025 Cubic feet(Amount of runoff to be stored in ponding area) <br /> 6-2 Divide Item 6-1 by Item 5-2 0.4 Feet(Depth of stored runoff in surface ponding area) <br /> 6-3 Convert Item 6-2 from ft to inches 5.2 Inches(Depth of stored runoff in surface ponding area) <br /> I 6-4 If ponding depth in Item 6-3 meets your target depth,skip to Item 8-1. If not,continue to Step 7-1. <br /> 7.0 Optimize Size of Treatment Measure <br /> 7-1 Enter an area larger or smaller than <br /> Item 5-2 2,610 Sq.ft.(enter larger area if you need less ponding depth;smaller for more depth.) <br /> I 7-2 Volume of treated runoff for area in <br /> Item 7-1 3,375 Cubic feet(Item 7-1*5 inches per hour*1/12*Item 4-2) <br /> 7-3 Subtract Item 7-2 from Item 3-3 725 Cubic feet(Amount of runoff to be stored in ponding area) <br /> 7-4 Divide Item 7-3 by Item 7-1 0.28 Feet(Depth of stored runoff in surface ponding area) <br /> 7-5 Convert Item 7-4 from feet to inches 3.33 Inches(Depth of stored runoff in surface ponding area) <br /> 7-6 If the ponding depth in Item 7-5 meets target,stop here. If not,repeat Steps 7-1 through 7-5 until you obtain target depth. <br /> 8.0 Surface Area of Treatment Measure for DMA MIIIIIIIIIINIIIIMIIIIIIIIIIMIIIIIIIIIIIIIIIM <br /> 8-1 Final surface area of treatment* 2,610 Square feet(Either Item 5-2 or final amount in Item 7-1) <br /> *Note:Check with the local jurisdiction as to its policy regarding the minimum biotreatment surface area allowed. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.