My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2017120097
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2017
>
Inst 2017120097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 2:46:30 PM
Creation date
7/17/2017 2:46:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
6/2/2017
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Bioretention Area Maintenance Plan for <br /> 1717 Doolittle Drive, San Leandro Ca <br /> Assessor's Parcel No.: 79A-541-10 <br /> Property Owner: D/C 1717 Doolittle sub LLC Phone No.: (310) 444-5550 <br /> Designated Contact: Adrian Comstock Phone No.: (310) 444-5550 <br /> Mailing Address: 1801 Century Park East, Suite 1095, Los Angeles CA 90067 <br /> The property contains three (6) bioretention area(s), located as described below and as shown in the <br /> attached site plan'. <br /> • Bioretention Area No. 1 is located at the northwest corner of the <br /> property, along Aurora Street. <br /> • Bioretention Area No. 2 is located at the southeast corner of the <br /> property along Williams Street <br /> • Bioretention Area No. 3 is located at the South side of the <br /> lot along Williams Street. <br /> • Bioretention Area No. 4 is located at the South side of the <br /> lot along Williams Street. <br /> • Bioretention Area No. 5 is located at the Southwest corner of the lot <br /> along Aurora Street. <br /> • Bioretention Area No. 6 is located at the West side of the lot <br /> along Aurora Street. <br /> I. Routine Maintenance Activities <br /> The principal maintenance objective is to prevent sediment buildup and clogging, which reduces <br /> pollutant removal efficiency and may lead to bioretention area failure. Routine maintenance <br /> activities, and the frequency at which they will be conducted, are shown in Table 1. <br /> Table 1 <br /> Routine Maintenance Activities for Bioretention Areas <br /> No. Maintenance Task Frequency of Task <br /> 1 Remove obstructions, debris and trash from bioretention Monthly, or as needed after storm <br /> area. events <br /> 2 Inspect bioretention area to ensure that it drains between Monthly, or as needed after storm <br /> storms. events <br /> 3 Inspect inlets for channels,soil exposure or other Monthly, or as needed after storm <br /> evidence of erosion. Clear obstructions and remove events <br /> sediment. <br /> 1 4 Remove and replace all dead and diseased vegetation. Twice a year <br /> 5 Maintain vegetation and the irrigation system. Prune and Before wet season begins, or as <br /> weed to keep bioretention area neat and orderly in needed <br /> I appearance. <br /> 6 Inspect and, if needed, replace mulch before wet season As needed <br /> begins. Replace mulch when erosion is evident or when <br /> bioretention area looks unattractive. <br /> 7 Replace mulch over entire area every two to three years, Once every two to three years <br /> if needed. <br /> 8 Inspect bioretention area using the attached inspection Monthly, or after large storm events, <br /> checklist. and after removal of accumulated <br /> debris or material <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.