My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2017011823
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2017
>
Inst 2017011823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 3:05:31 PM
Creation date
7/17/2017 3:05:19 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/17/2017
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. The storage of materials, installation of processes and/or equipment outdoors may place <br /> the facility into the Industrial/Commercial Facility Stormwater program and require <br /> submittal to the Regional Water Quality Control Board a Notice of Intent (NOI) to <br /> comply with the State Wide General Industrial Facility Permit. The elimination of <br /> exposure to stormwater by relocating indoors, covering or utilizing other engineered <br /> controls is highly recommended. <br /> J. The generation or discharge of wastewaters, other than domestic sewerage, may require <br /> a pretreatment permit for discharge to the sanitary sewer. If a permit is required, <br /> submittal of an application to the City's Environmental Services is required prior to <br /> finaling of the building permit or commencing the discharge; whichever shall occur <br /> first. <br /> K. A Planned Development subject to installation of structural stormwater treatment <br /> BMPs per section C3 of the Municipal Regional Permit shall complete a Stormwater <br /> Structural Treatment BMP Operation & Maintenance Data Form. The form shall be <br /> submitted to the City's Engineering Division prior to finaling of the grading permit. <br /> L. Changes to ownership, operator, maintenance contractor, Structural Treatment BMPs <br /> installed, the O&M Plan, or any other information contained in the Data Form shall be <br /> provided to the City by submittal of a revised O&M Data Form 30 days prior to the <br /> effective date of the change. Revised Data Forms shall be submitted to the <br /> Environmental Services Section. <br /> XII. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br /> A. The project shall comply with the applicable Building and Fire Codes as adopted by the <br /> City of San Leandro. Site, building and fire protection system plans shall be provided <br /> for review and approval by the Fire Department. Required emergency vehicle access <br /> shall be provided on the building permit plans to the satisfaction of the Fire <br /> Department. <br /> B. Fire hydrants and fire flow are required for the project per the California Fire Code <br /> Appendix B and C. Provide fire flow information for the site. The fire flow information <br /> is available from EBMUD. <br /> C. Each office building shall be provided with an automatic sprinkler system. The <br /> sprinkler systems are required to be monitored by an approved supervising station. <br /> D. A Knox box is required at the entry to each building. In the event driveway(s) are <br /> gated, a Knox key switch is required at the gate in the driveway. <br /> E. Prior to issuance of building permits, project plans shall show that all areas on-site that <br /> are required to be marked "No Parking" and painted red, including any turnaround on <br /> the site and any required fire lanes. <br /> Agreement to Conditions April 21,2014 <br /> PLN2013-00045 Page 21 of)/3/ay <br />
The URL can be used to link to this page
Your browser does not support the video tag.