My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-102
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:51:35 PM
Creation date
7/20/2017 1:29:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0717 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
8D Consent Calendar 2017 0717
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
Agmt 2017 Strategic Products and Services, LLC for Cisco Phone System Upgrade Project
(Reference)
Path:
\City Clerk\City Council\Agreements\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall take all necessary precautions and provide all necessary safeguards to <br />prevent personal injury and property damage. Contractor shall provide protection for all <br />persons including, but not limited to, its employees and employees of its subcontractors; <br />membersofthe public; and employees, agents, and representatives of the City and <br />regulatory agencies that may be on or about the work. <br />The services of the City in conducting review and inspection of Contractor's performance is <br />not intended to include review of the adequacy of Contractor's work methods, equipment, <br />bracing or scaffolding, or safety measures, in, on, or near any Contractor jobsite. <br />All work and materials shall be in strict accordance with all applicable state, city, county, <br />and federal rules, regulations and codes, with specific attention to the United States <br />Department of Labor Occupational Health and Safety Administration (OSHA) <br />requirements. Contractor shall be solely responsible for compliance with all city, county, <br />and state explosive transport, storage, and blasting requirements and for any damages <br />caused by such operations. <br />Contractor is hereby informed that work on City property could be hazardous. Contractor <br />shall carefully instruct all personnel working on City property that all conditions of the <br />property are potentially hazardous work areas as to potential dangers and shall provide <br />such necessary safety equipment and instructions as are necessary to prevent injury to <br />personnel and damage to property. Special care shall be exercised relative to work <br />underground. <br />In addition to complying with all other safety regulations, Contractor shall abide by any and <br />all other City requirements contained in any specifications, special conditions or manuals, <br />which shall be made available by City upon request. <br />Contractor shall provide and maintain all necessary safety equipment such as fences, <br />barriers, signs, lights, walkways, guards, and fire prevention and fire -fighting equipment <br />and shall take such other action as is required to fulfill its obligations under this section. <br />is the intent of the City to provide a safe working environment under normal conditions. <br />CONTRACTOR IS ADVISED THAT CITY'S OPERATIONS AND PROPERTY ARE <br />INHERENTLY HAZARDOUS BECAUSE OF CONDITIONS SUCH AS CONFINED <br />SPACES, POTENTIALLY EXPLOSIVE ATMOSPHERES, AND POSSIBLE EXPOSURE <br />TO PATHOGENS. <br />Contractor shall maintain all portions of the jobsite in a neat, clean, and sanitary condition <br />at all times. <br />Contractor shall keep adequate first aid facilities and supplies available and instruction in <br />first aid for its employees shall be given. <br />Consulting Services Agreement between City of San Leandro and 07/17/2017 <br />Strategic Products and Services, LLC for Cisco Phone System Upgrade Page 5 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.