My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-096
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:52:30 PM
Creation date
7/24/2017 1:09:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0717 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
5A Public Hearings 2017 0717
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />RE: Exhibit -CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN16-oo67) <br />JULY 17, 2017 <br />Page 6 <br />Source: San Leandro 2007,2007a, 2o16b, 2016c, 2017. <br />*The project site zoning was changed from Public/Semi Public District to DA -6 in November2016. <br />The project would implement General Plan Policies and Mitigation Measures listed in the TOD Strategy <br />EIR to reduce project impacts to less than significant. The TOD Strategy EIR was published in 2007, and <br />therefore utilizes General Plan policies and actions from the previous, 2002, San Leandro General Plan <br />and General Plan EIR. Table 3, below, lists the applicable zooz General Plan policies, 2002 General.Plan <br />EIR mitigation measures, and 2007TOD Strategy EIR mitigation measures identified in the TOD Strategy <br />ProposedTable 2: Allowed vs. <br />Applicable Regulations <br />Proposed <br />Consistent <br />Development/Site <br />The purpose of this designation is to <br />provide for a mix of high-intensity land <br />Transit Oriented <br />uses that capitalize on proximity to the San <br />Development Mixed <br />Leandro BART station. This designation <br />Transit Oriented <br />Use General Plan <br />maximizes the potential fortransit- <br />Development Mixed <br />Yes <br />Land Use Designation <br />oriented infill development and achieves <br />Use <br />compatible transitions to adjacent <br />residential districts through design <br />standards and zoning. <br />The purpose of this designation is to <br />implement specific provisions of the <br />Downtown San Leandro Transit -Oriented <br />Downtown Area (DA- <br />Development Strategy. Permitted uses <br />Yes <br />6)* Zoning <br />include artists' studios, business services, <br />DA -6 <br />cafes, retail, instruction and improvement <br />services, mixed use residential, multi- <br />family residential, offices, and park and <br />recreation facilities. <br />86 -feet, two -inches <br />to the parapet; 93 - <br />Height <br />No height maximum <br />feet, eight -inches to <br />Yes <br />top of elevator <br />penthouse <br />Minimum Residential <br />6o units/acre <br />63.6 units/acre <br />Yes <br />Density <br />Minimum Lot Area <br />1o,000 square feet <br />136,547 square feet <br />Yes <br />Minimum Lot Width <br />loo feet <br />170 feet <br />Yes <br />Maximum Lot <br />Coverage <br />loo percent <br />- <br />36.7 percent <br />Yes <br />Maximum Stories <br />7 stories <br />7 stories <br />Yes <br />Minimum Floor Area <br />Ratio (FAR) <br />1.o FAR <br />1.48 FAR <br />Yes <br />Parking <br />223 spaces <br />229 spaces <br />Yes <br />Source: San Leandro 2007,2007a, 2o16b, 2016c, 2017. <br />*The project site zoning was changed from Public/Semi Public District to DA -6 in November2016. <br />The project would implement General Plan Policies and Mitigation Measures listed in the TOD Strategy <br />EIR to reduce project impacts to less than significant. The TOD Strategy EIR was published in 2007, and <br />therefore utilizes General Plan policies and actions from the previous, 2002, San Leandro General Plan <br />and General Plan EIR. Table 3, below, lists the applicable zooz General Plan policies, 2002 General.Plan <br />EIR mitigation measures, and 2007TOD Strategy EIR mitigation measures identified in the TOD Strategy <br />
The URL can be used to link to this page
Your browser does not support the video tag.