My WebLink
|
Help
|
About
|
Sign Out
Home
MOU San Leandro Improvement Association Project 2016.0071 Ag No. 3049
CityHall
>
City Clerk
>
MOU
>
MOU San Leandro Improvement Association Project 2016.0071 Ag No. 3049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 10:24:53 AM
Creation date
7/26/2017 10:20:54 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
10/3/2016
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Whether the Project will be of a temporary or semi-permanent nature. <br /> VI. Pre-and Post-Construction Walk-throughs <br /> Prior to installation or placement of any items, the City and SLIA staff will jointly schedule a <br /> walk-through of the area. A second walk-through will be scheduled within 7 days after any <br /> items are removed. Any damage to City facilities or infrastructure caused by SLIA or its <br /> contractors' actions must be promptly repaired by SLIA at SLIA's expense and to the City's <br /> satisfaction. If damage is not corrected within 30 days, the City has the right to perform the <br /> repair and invoice SLIA for all associated direct and indirect costs including, but not limited <br /> to, overhead and administration. If a pre-installation walk-thru is not performed, SLIA <br /> waives all rights for determination of potential damage and may be held liable in total for all <br /> repairs/replacement deemed necessary by the City. <br /> VI I. Special Considerations for Artistic and Park Projects <br /> In 2014 the City Council paneled a City Arts Commission to guide the placement and <br /> development of public art. Accordingly, any installations that include an artistic component <br /> may require a recommendation of support from the City's Arts Commission. In these <br /> instances, SLIA should allow more time for approval by the City. <br /> Any projects that will impact the use or visual character of City parks may require review by <br /> the Recreation and Parks Commission. In these instances, SLIA should allow more time for <br /> approval by the City. <br /> VIII. Written Approval of Projects <br /> For all placement and installation of items covered under this MOU,the City will provide <br /> written requirements and confirmation of approval to SLIA staff. City shall have no less than <br /> four weeks advance notice of SLIA activities governed by this MOU. No items shall be <br /> placed or installed prior to SLIA receipt of City's written approval. SLIA shall obtain no <br /> property rights, including but not limited to fee simple, easements, or obtain rights by <br /> adverse possession by or through an installations permitted by the City. The City's <br /> permission provides at most a temporary, revocable, non-exclusive license to use City right- <br /> of-way and/or City property. Unauthorized installations or placements shall be removed <br /> immediately. If such unauthorized installations or placements are not removed <br /> immediately, then City shall remove such installations and charge all costs of removal back <br /> to SLIA. <br /> IX. Construction Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.