My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1998-008
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1998
>
Reso 1998-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:30:19 AM
Creation date
8/2/2017 10:41:56 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
1/5/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
initial acceptance of the entire work by City. Subdivider shall repair or replace any or all such work <br />or material, together with all or any other work or materials which may be displaced or damaged in <br />so doing, that may prove defective in workmanship or material within said one year guarantee <br />period without expense or charge of any nature whatsoever to City. Subdivider further covenants <br />and agrees that when defects in design, workmanship and materials actually appear during the <br />guarantee period, and have been corrected, the guarantee period shall automatically be extended for <br />an additional year to insure that such defects have actually been corrected. <br />In the event the Subdivider shall fail to comply with the conditions of the foregoing <br />guarantee within thirty (30) days time, after being notified of the defect in writing, City shall have <br />the right, but shall not be obligated, to repair or obtain the repair of the defect, and Subdivider shall <br />pay to City on demand all costs and expense of such repair. Notwithstanding anything herein to the <br />contrary, in the event that any defect in workmanship or material covered by the foregoing <br />guarantee results in a condition which constitutes an immediate hazard to the public health, safety, <br />or welfare, City shall have the right to immediately repair, or cause to be repaired, such defect, and <br />Subdivider shall pay to City on demand all costs and expense of such repair. The foregoing <br />statement relating to hazards to health and safety shall be deemed to include either temporary or <br />permanent repairs which may be required as determined in the sole discretion and judgment of <br />City. <br />If City, at its sole option, makes or causes to be made the necessary repairs or replacements <br />or performs the necessary work, Subdivider shall pay, in addition to actual costs and expenses of <br />such repair or work, fifty percent (50%) of such costs and expenses for overhead and interest at the <br />C:\MAPS\PM6662\SUBR,APAG.DOC <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.