My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2017 Chrisp Company
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2017
>
Agmt 2017 Chrisp Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:32:06 AM
Creation date
8/7/2017 11:42:56 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
Reso 2017-109
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />Citywide Street Re -Striping <br />Bid No. 16-17.027 <br />Scope of Work <br />This project consists of furnishing all labor, materials, equipment, and supervision to perform the <br />following: <br />Work: <br />Refresh existing striping on the attached list of City Streets*. The work for which this proposal is <br />submitted is for construction in accordance with the Standard Specifications of Public Works <br />Construction, 2010 edition, adopted by the American Public Works Association, Southern <br />California Chapter, and Sections 84 & 85/or the 2012 edition of the California Department of <br />Transportation (CALTRANS) Standard Specifications and the Special Provisions (Technical <br />Specifications) and Standard Plans hereto adopted by the City Engineer (available at <br />http://sanleandro.org/civicaxtfilebank/blobdload.asnx?BloblD=15853 ). <br />*All work to be paint striping only. Installation or replacement of delineators is not included in the <br />scope of work <br />Striping <br />• Double Yellow (with painted black center) <br />• Broken Yellow <br />• White <br />-All as indicated on the Street Schedules <br />Paint <br />• Paint specifications for quick -drying yellow, black and white are attached <br />Notes: <br />This is a prevailing wage rate job. <br />A California Contractor's license C-32 is required to do this work. <br />Striping hours are Sunday through Thursday from 10:00 p.m. to 5:00 a.m. <br />Contractor must begin work within thirty (30) days after receiving the Notice to Proceed. <br />Contractor must give two (2) -weeks' notice prior to start of striping. <br />Contractor is responsible for all traffic control related to the job. Traffic control must be used to <br />prevent traffic from driving on new paint. Contractor is responsible for clean-up of paint tracked by <br />vehicles, pedestrians, bicycles, or other source and for re -striping these damaged areas after each <br />occurrence. <br />The City will have a representative working at night to serve as the inspector/quality control person <br />and liaison to the crew foreman <br />Non -Professional Services Agreement between City of San Leandro and Chrisp Company 07/17/2017 <br />Exhibit A — Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.