Laserfiche WebLink
Crosswalk Location: <br />Total Score: <br />Prepared by: <br />Date: <br />Value Score Comments <br />A.None 0 <br />B. <br />2 4 <br />No 0 <br />Yes 2 <br />C.30 mph 4 <br />D.10,000 to 15,000 vpd 3 10,400 vpd <br />E. <br />0 accident 0 <br />F. <br />No 0 <br />one head-on collision <br />G. <br />Yes -5 <br />290 feet to <br />Bancroft/Dutton <br />H.Minor Arterial 3 <br />I. <br />No 0 <br />J.No 0 no ped counts <br />center turn lane or median <br />ADT - Average Weekday Daily Traffic <br />Posted Speed Limit or 85th Percentile Speed <br />2 through lanes with <br />bike lane and parking <br />Roadway Cross Section <br />School <br />Pedestrian Volume >= 20 peds in one peak hour <br />Coordination. Project can be coordinated with another <br />Capital Improvement Project, Grant Opportunity, <br />Development, or Overlay project for efficiency in design and <br />construction and reduced resource demand. <br />Crossing roadway classification <br />Accident History (pedestrian/bike) within crossing locsation in <br />past 3 years <br />Traffic Signal or existing marked crosswalk located within 500 <br />feet of subject review location <br />Accident History (vehicle) - 5 or more rear end collision in <br />past 3 years associated with activity from the crossing <br />through lanes <br />City of San Leandro Crosswalk Scoring Sheet <br />6 <br />Criteria <br />Bancroft Ave and Oakes Blvd <br />16 <br />bike lane and/or parking <br />Dean Hsiao <br />10/26/2016 <br />200