My WebLink
|
Help
|
About
|
Sign Out
Home
8R Consent 2017 0905
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0905
>
8R Consent 2017 0905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 5:05:18 PM
Creation date
8/28/2017 5:05:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/5/2017
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
E.Specific adverse impact means a significant, quantifiable, direct and unavoidable impact, <br />based on objective, identified and written public health or safety standards, policies or <br />conditions as they existed on the date the application was deemed complete. <br />Sec. 7-5-1510 Expedited permitting process. <br />The Building Official shall implement an expedited, streamlined permitting process for electric <br />vehicle charging stations consistent with this article, and adopt a checklist of all requirements with which electric vehicle charging stations shall comply with in order to be eligible for <br />expedited review. The expedited, streamlined permitting process and checklist may refer to the <br />recommendations contained in the most current version of the “Plug-In Electric Vehicle <br />Infrastructure Permitting Checklist” of the “Zero-Emission Vehicles in California: Community <br />Readiness Guidebook” as published by the Governor’s Office of Planning and Research. The City’s adopted checklist shall be published on the City's website and shall be accessible to the <br />public. <br />Sec. 7-5-1515 Permit application processing. <br />A. Prior to submitting an application for processing, the applicant shall verify that the <br />installation of an electric vehicle charging station will not have specific, adverse impact to public <br />health and safety and building occupants. Verification by the applicant includes, but is not <br />limited to, inspection of the following: electrical system capacity and loads; electrical system wiring, bonding and overcurrent protection; building infrastructure affected by charging station equipment and associated conduits; and areas of charging station equipment and vehicle parking. <br />B. A permit application that satisfies the information requirements in the City's adopted checklist shall be deemed complete and be promptly processed. Upon confirmation by the Building Official that the permit application and supporting documents meet the requirements of <br />the city’s adopted checklist, and are consistent with all applicable laws and health and safety <br />standards, the Building Official shall, consistent with Government Code Section 65850.7, <br />approve the application and issue all necessary permits. <br />C. Approval does not authorize an applicant to energize or utilize the electric vehicle <br />charging station unless and until approval is granted by the applicable electric utility. <br />D. An inspection may be required and performed by the Building Official. If an inspection <br />is required, the inspection shall be done in an efficient and timely manner. If the electric vehicle <br />charging station fails the initial inspection, a subsequent inspection may be required. <br />E. If the Building Official determines that the permit application is incomplete, he or she <br />shall issue a written correction notice to the applicant, detailing all deficiencies in the application <br />and any additional information required to be eligible for expedited permit issuance. <br />408
The URL can be used to link to this page
Your browser does not support the video tag.