My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2017 0918
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0918
>
8B Consent 2017 0918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2017 3:43:52 PM
Creation date
9/12/2017 3:43:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/18/2017
Retention
PERM
Document Relationships
Reso 2017-131
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-347 <br />This project was posted on the City’s website and was advertised in the Daily Review on July 27, <br />2017. Notification of this bid opportunity was also sent to local Builder’s Exchanges as well as <br />contractors who registered with the City to be informed of bidding opportunities. <br />Applicable General Plan Policies <br />·Policy CSF 6.4 Wastewater Collection and Treatment. Maintain efficient, <br />environmentally sound, and cost-effective wastewater collection and treatment services in <br />San Leandro. <br />·Policy CSF 6.8 Maintenance. Ensure that sufficient funding is provided for the ongoing <br />maintenance of City-owned facilities, including streets, street lights, traffic signals, <br />landscaping, street trees, storm drains, public buildings and other infrastructure. <br />Environmental Review <br />This project is categorically exempt from the California Environmental Quality Act (CEQA) per <br />Section 15301(c) of the CEQA guidelines. The Notice of Exemption was filed with the Alameda <br />County Recorder on March 24, 2017. <br />Fiscal Impacts <br />The total project cost is estimated at $1,515,000 as follows: <br />Design and Bid:$ 25,000 <br />Consulting Services (Survey, Geotechnical, Environmental):$ 120,000 <br />Construction Contract:$1,052,000 <br />Construction Management and Inspection:$ 55,000 <br />Construction Contingency:$ 263,000 <br />TOTAL:$1,515,000 <br />Budget Authority <br />The project design is funded as follows: <br />Account No. Reso, Appropriate Dates & Source Amount <br />593-52-258 Reso. 2013-072, 2014-15 Adopted Budget $860,000 <br />WPCP Enterprise Fund <br />Additional funding for this project, if needed, will be requested at the time of award of a <br />construction contract. <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Page 3 City of San Leandro Printed on 9/12/2017
The URL can be used to link to this page
Your browser does not support the video tag.