Laserfiche WebLink
EXHIBIT A <br />CHAPTER 7-5 BUILDING CODE <br />ARTICLE 15. ELECTRIC VEHICLE CHARGING STATION PERMITS <br />Sec. 7-5-1500 Purpose and intent. <br />Sec. 7-5-1505 Definitions. <br />Sec. 7-5-1510 Expedited permitting process. <br />Sec. 7-5-1515 Permit application processing. <br />Sec. 7-5-1520 Technical review. <br />Sec. 7-5-1525 Electric vehicle charging station installation requirements. <br />Sec. 7-5-1500 Purpose and intent. <br />The purpose and intent of this article is to promote and encourage the use of electric vehicles by <br />creating an expedited, streamlined, permitting process for electric vehicle charging stations while <br />promoting public health and safety and preventing specific adverse impacts in the installation <br />and use of such charging stations. This article is intended to comply with the requirements of <br />Government Code Section 65850.7. <br />Sec. 7-5-1505 Definitions. <br />For purposes of this article, the following words and phrases shall have the meanings provided <br />below: <br />A.Electric vehicle charging station or charging station means any level of electric vehicle <br />supply equipment station that is designed and built in compliance with Article 625 of the <br />California Electrical Code, as it reads on the effective date of this article, and delivers <br />electricity from a source outside an electrical vehicle into a plug-in electric vehicle. <br />B.Building Official means the Chief Building Official of the City of San Leandro or his or <br />her designee. <br />C.Electronic submittal means the utilization of one or more of the following: <br />(1)E-mail, <br />(2)The internet, <br />(3)Facsimile. <br />D.Feasible method to satisfactorily mitigate or avoid the specific adverse impact includes, <br />but is not limited to, any cost-effective method, condition or mitigation imposed by the <br />city on another similarly situated application in a prior successful application for a similar <br />permit.