My WebLink
|
Help
|
About
|
Sign Out
Home
8J Consent 2017 0918
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0918
>
8J Consent 2017 0918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2017 3:44:00 PM
Creation date
9/12/2017 3:43:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/18/2017
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
F.Upon a determination of the City Manager that the City has such capabilities, the <br />Building Official shall allow for electronic submittal of permit applications covered by this <br />article and associated supporting documents. <br />Sec. 7-5-1520 Technical review. <br />A.If the Building Official makes a finding, based on substantial evidence, that the electric <br />vehicle charging station could have a specific adverse impact upon the public health or safety, <br />the city may require the applicant to apply for a Use Permit pursuant to the City’s Zoning Code. <br />B.In the technical review of an electric vehicle charging station, the Building Official shall <br />not condition the approval of any electric vehicle charging station permit on the approval of such <br />a system by an association, as that term is defined by Civil Code Section 4080. <br />Sec. 7-5-1525 Electric vehicle charging station installation requirements. <br />A.Electric vehicle charging station equipment shall meet the requirements of the California <br />Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers <br />Association, and accredited testing laboratories such as Underwriters Laboratories, and rules of <br />the Public Utilities Commission or applicable electric utility regarding safety and reliability. <br />B.Installation of electric vehicle charging stations and associated wiring, bonding, <br />disconnecting means, and overcurrent protective devices shall meet the requirements of Article <br />625 and all applicable provisions of the California Electrical Code. <br />C.Installation of electric vehicle charging stations shall be incorporated into the load <br />calculations of all new or existing electrical services and shall meet the requirements of the <br />California Electrical Code. Electric vehicle charging equipment shall be considered a continuous <br />load. <br />D.Anchorage of either floor-mounted or wall-mounted electric vehicle charging stations <br />shall meet the requirements of the California Building or Residential Code as applicable per <br />occupancy, and the provisions of the manufacturer’s installation instructions. Mounting of <br />charging stations shall not adversely affect building elements. <br />2843932.1
The URL can be used to link to this page
Your browser does not support the video tag.