Laserfiche WebLink
COOPERATIVE AGREEMENT <br />BETWEEN THE STAKEHOLDER AGENCY AND AC TRANSIT FOR DESIGN, CONSTRUCTION, OPERATIONS AND MAINTENANCE OF THE <br />SOUTH ALAMEDA COUNTY MAJOR CORRIDORS TRAVEL TIME IMPROVEMENT PROJECT <br />Exhibit E: SHARING RESPONSIBILITES BEWEEN COUNTY OF ALAMEDA AND AC TRANSIT <br />Item Description Responsibility <br />1 Provide 8 - 2070 Signal Controllers w D4 Software & KITS/Kadence (adaptive) Licenses 100% AC Transit Project <br />2 Install 8 - 2070 Signal Controllers preloaded w D4 Software & KITS/Kadence (adaptive) Licenses 100% County Project <br />3 Provide & Install 8000' of Comm. Conduit (a)100% County Project <br />4 Provide & Install 8000' of 48 strands of Fiber I/C 100% County Project <br />5 Provide 8 - Ethernet IP Fiber Switch comm. units 50%/50% Share <br />6 Provide 2 - Ethernet - over - Copper comm. units 50%/50% Share <br />7 Install 10 - Ethernet Comm. upgrade units 100% County Project <br />8 Consultant Extra Service for Phased Implementation/Deployment of Adaptive Signal System 100% AC Transit Project <br />9 Provide TSP Equipment for 8 Signalized Intersections 100% AC Transit Project <br />10 Install TSP Equipment for 8 Signalized Intersections 100% County Project <br />11 Provide & Install Adaptive System Detection Loops at 8 Signalized Intersections 100% County Project <br />12 Provide Adaptive/TSP System Corridor After Study for MTC Ultimate Project Report (b)100% County Project <br />(a) Trench dug and communication conduit provided and installed as part of County project. <br />Note: All Systems Testing and Integration Included in County Project <br />(b) After Study performed by the County will be limited to County project boundaries, located within County R/W limits, and remain <br /> consistent with the same level of evaluation MTC performed on the rest of the corridor. <br />52