My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent Calendar 2017 1002
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1002
>
8B Consent Calendar 2017 1002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 6:07:03 PM
Creation date
9/25/2017 5:27:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
10/2/2017
Retention
PERM
Document Relationships
Reso 2017-134
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
COOPERATIVE AGREEMENT <br />BETWEEN THE STAKEHOLDER AGENCY AND AC TRANSIT FOR DESIGN, CONSTRUCTION, OPERATIONS AND MAINTENANCE OF THE <br />SOUTH ALAMEDA COUNTY MAJOR CORRIDORS TRAVEL TIME IMPROVEMENT PROJECT <br />Exhibit E: SHARING RESPONSIBILITES BEWEEN COUNTY OF ALAMEDA AND AC TRANSIT <br />Item Description Responsibility <br />1 Provide 8 - 2070 Signal Controllers w D4 Software & KITS/Kadence (adaptive) Licenses 100% AC Transit Project <br />2 Install 8 - 2070 Signal Controllers preloaded w D4 Software & KITS/Kadence (adaptive) Licenses 100% County Project <br />3 Provide & Install 8000' of Comm. Conduit (a)100% County Project <br />4 Provide & Install 8000' of 48 strands of Fiber I/C 100% County Project <br />5 Provide 8 - Ethernet IP Fiber Switch comm. units 50%/50% Share <br />6 Provide 2 - Ethernet - over - Copper comm. units 50%/50% Share <br />7 Install 10 - Ethernet Comm. upgrade units 100% County Project <br />8 Consultant Extra Service for Phased Implementation/Deployment of Adaptive Signal System 100% AC Transit Project <br />9 Provide TSP Equipment for 8 Signalized Intersections 100% AC Transit Project <br />10 Install TSP Equipment for 8 Signalized Intersections 100% County Project <br />11 Provide & Install Adaptive System Detection Loops at 8 Signalized Intersections 100% County Project <br />12 Provide Adaptive/TSP System Corridor After Study for MTC Ultimate Project Report (b)100% County Project <br />(a) Trench dug and communication conduit provided and installed as part of County project. <br />Note: All Systems Testing and Integration Included in County Project <br />(b) After Study performed by the County will be limited to County project boundaries, located within County R/W limits, and remain <br /> consistent with the same level of evaluation MTC performed on the rest of the corridor. <br />52
The URL can be used to link to this page
Your browser does not support the video tag.