Laserfiche WebLink
Section 1090 et seq., and, if applicable, will be disqualified from holding public office in the <br /> State of California. <br /> 10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or <br /> interview related to this Agreement, either orally or through any written materials. <br /> 10.9 Contract Administration. This Agreement shall be administered by Yin-Kuei I. Lin <br /> ("Contract Administrator"). All correspondence shall be directed to or through the Contract <br /> Administrator or his or her designee. <br /> 10.10 Notices. Any written notice to Consultant shall be sent to: <br /> J. Ryan Shafer <br /> Nichols Consulting Engineers <br /> 501 Canal Boulevard, Suite I <br /> Point Richmond, CA 94804 <br /> Any written notice to City shall be sent to: <br /> Austine Osakwe <br /> City of San Leandro <br /> Engineering and Transportation Department <br /> 835 East 14th Street <br /> San Leandro, CA 94577 <br /> With a copy to: <br /> City of San Leandro <br /> Department of Finance <br /> c/o Purchasing Technician <br /> 835 East 14th Street <br /> San Leandro, CA 94577 <br /> 10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br /> the first page of a technical report, first page of design specifications, and each page of <br /> construction drawings shall be stamped/sealed and signed by the licensed professional <br /> responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br /> "Seal and Signature of Registered Professional with report/design responsibility," as in the <br /> following example. <br /> Seal and Signature of Registered Professional with <br /> report/design responsibility. <br /> 10.12 Integration. This Agreement, including the scope of work attached hereto and <br /> incorporated herein as Exhibits A, B, C and D represents the entire and integrated <br /> Consulting Services Agreement between City of San Leandro and <br /> NCE for Annual Street Overlay/Rehabilitation 2017-18 Project Page 13 of 15 <br />