My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2017 CSG Consultants
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2017
>
Agmt 2017 CSG Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2017 4:06:33 PM
Creation date
9/27/2017 3:38:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/5/2017
Retention
PERM
Document Relationships
Reso 2017-115
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prevailing wages is not excusable if the Consultant or subcontractor had knowledge of their <br /> obligations under the California Labor Code. The Consultant or subcontractor shall pay the <br /> difference between the prevailing wage rates and the amount paid to each worker for each <br /> calendar day or portion thereof for which each worker was paid less than the prevailing wage <br /> rate. If a subcontractor worker engaged in performance of the services described in Exhibit A is <br /> not paid the general prevailing per diem wages by the subcontractor, the Consultant is not liable <br /> for any penalties therefore unless the Consultant had knowledge of that failure or unless the <br /> Consultant fails to comply with all of the following requirements: <br /> 1. The contract executed between the Consultant and the subcontractor for the performance of <br /> part of the services described in Exhibit A shall include a copy of the provisions of California <br /> Labor Code Sections 1771, 1775, 1776, 1777.5, 1813, and 1815. <br /> 2. The Consultant shall monitor payment of the specified general prevailing rate of per diem <br /> wages by the subcontractor by periodic review of the subcontractor's certified payroll <br /> records. <br /> 3. Upon becoming aware of a subcontractor's failure to pay the specified prevailing rate of <br /> wages, the Consultant shall diligently take corrective action to halt or rectify the failure, <br /> including, but not limited to, retaining sufficient funds due the subcontractor for performance <br /> of the services described in Exhibit A. <br /> 4. Prior to making final payment to the subcontractor, the Consultant shall obtain an affidavit <br /> signed under penalty of perjury from the subcontractor that the subcontractor has paid the <br /> specified general prevailing rate of per diem wages for employees engaged in the <br /> performance of the services described in Exhibit A and any amounts due pursuant to <br /> California Labor Code Section 1813. <br /> C. In accordance with California Labor Code Section 1776, the Consultant and each subcontractor <br /> engaged in performance of the services described in Exhibit A shall keep accurate payroll <br /> records showing the name, address, social security number, work, straight time and overtime <br /> hours worked each day and week, and the actual per diem wages paid to each journeyman, <br /> apprentice, worker, or other employee employed in performance of the services described in <br /> Exhibit A. Each payroll record shall contain or be verified by a written declaration that it is made <br /> under penalty of perjury, stating both of the following: <br /> 1. The information contained in the payroll record is true and correct. <br /> 2. The employer has complied with the requirements of California Labor Code Sections 1771, <br /> 1811, and 1815 for any work performed by the employer's employees on the public works <br /> project. <br /> The payroll records required pursuant to California Labor Code Section 1776 shall be certified <br /> and shall be submitted directly to the Labor Commission, and available for inspection by the <br /> Owner and its authorized representatives, the Division of Labor Standards Enforcement, the <br /> Consulting Services Agreement between City of San Leandro and CSG Consultants 7/19/2017 <br /> for On-Call Civil Engineering and Land Surveying Consulting Services Exhibit D—Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.