My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2017 1016
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1016
>
8D Consent Calendar 2017 1016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2017 3:54:52 PM
Creation date
10/11/2017 3:54:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
10/16/2017
Retention
PERM
Document Relationships
Reso 2017-141
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-476 <br />project and project schedule <br />Fiscal Impacts <br />A summary of the construction contract with Cal Electro, Inc., is below: <br />Original Contract $ 427,830 <br />Change Orders $ 18,383 <br />Total Contract Amount $ 446,213 <br />The total project cost is $2,648,000 including design, construction administration plus work <br />completed previously under this grant funding. <br />Budget Authority <br />The funding for the entire project is as follows: <br />Account No. Source. & Approp. Date Appropriation Amount <br />150-38-347 EDA Grant, FY 2012-13 $2,121,000 <br />120-38-347 DFSI, FY 2012-13 150,000 <br />210-38-347 CIP Fund, FY 2012-13 352,000 <br />120-28-196 DFSI, FY 2016-17 25,000 <br />Subtotal $2,648,000 <br />ATTACHMENT <br />·Fiber Optic Conduit Network Map <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 4 City of San Leandro Printed on 10/10/2017 <br />32
The URL can be used to link to this page
Your browser does not support the video tag.