My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2017160972
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2017
>
Inst 2017160972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2017 5:48:47 PM
Creation date
10/21/2017 5:48:25 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/24/2017
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Off-Site Improvement Conditions: <br /> 1. The Applicant shall obtain an Encroachment Permit from the Engineering and <br /> Transportation Department for any work within the Public Right-of-Way. <br /> 2. The Applicant shall remove any broken and uplifted sidewalk, driveway, curb and <br /> gutter along the full project frontage and shall construct new City standard sidewalk, <br /> driveway, curb and gutter in the same location and alignment as the existing curb and <br /> gutter. The applicant shall remove any unused driveways and construct new City <br /> standard sidewalk and curb and gutter in the same location and alignment as the <br /> existing sidewalk and curb and gutter. Driveways entering the site and sidewalk in the <br /> public right-of-way shall be installed per City of San Leandro Standard Plans. <br /> D. Site Conditions: <br /> 1. The Applicant shall place all utilities serving the site underground. <br /> E. Other Conditions: <br /> 1. Development Fee for Street Improvement (DFSI) will be due for the project and is <br /> estimated to be $3,203.48. Credit has been given for the existing warehouse that will <br /> be demolished as part of this project. This fee is subject to change on July 1 of each <br /> year. <br /> 2. The Marina Boulevard/1-880 Traffic Impact Fee will be due for the project, and is <br /> estimated to be $2,342.04. Credit has been given for the existing warehouse that will <br /> be demolished as part of this project. This fee is subject to change on July 1 of each <br /> year. <br /> V. ENVIRONMENTAL SERVICES REQUIREMENTS <br /> A. The Changes to the site require updating and resubmittal of the site's Hazardous <br /> Materials Business Plan (HMBP) in the California Environmental Reporting System <br /> (CERS) online database at http://cers.calepa.ca.gov/. The plan is subject to the review <br /> and approval of the City of San Leandro Environmental Services. <br /> VI. FIRE DEPARTMENT REQUIREMENTS <br /> A. A Fire Permit application submittal shall be provided for the modification to the fire <br /> sprinkler system. <br /> B. A High Piled Permit application shall be completed and submitted for the storage <br /> within the structure. <br /> C. Building Permit application submittal shall include the following: <br /> 1. A Knox Box shall be provided for fire department access. <br /> Agreement to Conditions April 28, 2017 <br /> PLN 17-0011 Page 7 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.