My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2017186059
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2017
>
Inst 2017186059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2017 5:53:44 PM
Creation date
10/21/2017 5:53:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
8/24/2017
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Leandro Standard Plan Dwg. No. 102 prior to Certificate of Occupancy. Building Permit <br /> application plans shall callout for this improvement. <br /> 3. Sanitary sewer lateral is shown to connect to the main line on Nicholson Street. The City will <br /> inspect for any defects in this sanitary sewer segment on Nicholson Street and if the new lateral <br /> connection will cause any structural damage to the sanitary sewer main line, the applicant shall <br /> replace the main pipeline from joint to joint.as part of this project prior to making the sewer <br /> lateral connection. <br /> C. Other: <br /> 1. The City's traffic impact fee program is called "Development Fee for Street Improvements" <br /> (DFSI). Pursuant to the adopted 2016-17 Fee Schedule, the rate for General Retail is $4.15 per <br /> gross building square foot with a credit offered for the prior General Industrial use at the rate of <br /> $1.19 per gross building square foot. The building area is 4,361 square feet, thus the DFSI fee <br /> of $12,908.56 shall be due prior to issuance of the building permit. This fee is subject to <br /> change each fiscal year and is not vested until Building Permit issuance. <br /> 2. A one-time Marina Boulevard/Interstate 880 Traffic Impact Fee is estimated approximately in <br /> the amount of $3,357.97, which is calculated at $1.64 per gross building square foot for the <br /> proposed General Retail use and shall be due at the time of Building permit issuance. This <br /> estimated fee includes a credit for existing General Industrial building on the site at the rate of <br /> $0.87 per gross building square foot. This fee is subject to change at the beginning of each <br /> fiscal year and is not vested until Building Permit issuance. <br /> VI. BUILDING AND SAFETY SERVICES DIVISION REQUIREMENTS <br /> A. Building Permit application submittal shall include but is not limited to the following: <br /> 1. Provide accessible entrance, counter and restroom. <br /> 2. Provide manufactures specifications on all washing equipment and sump pump. <br /> 3. Provide ventilation details on new car washing area. <br /> B. Title 24 shall be required for any modifications to interior or exterior lighting, mechanical <br /> equipment, and said lighting and mechanical equipment shall comply with all Non-Residential <br /> Mandatory Measures. <br /> C. Any new equipment shall conform to Electrical Code. (Note: Said new equipment may require <br /> electrical main panel upgrade.). <br /> VII. FIRE DEPARTMENT REQUIREMENTS <br /> A. Building Permit application submittal, for Fire Code compliance, shall include but is not <br /> limited to the following: <br /> Agreement to Conditions June 16, 2017 <br /> PLN17-0017 Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.