|
Prior to being spray buffed, the terrazzo floor area shall be swept, vacuumed and completely wet-mopped. A
<br /> single disc floor machine, spray buffing pad, and spray bottle with spray buff solution shall be used to restore a
<br /> uniform gloss and protective finish to the floors, which are coated with metal-link polymer floor finish. The floor
<br /> finish shall be the same type as that already on the floor. All areas showing wear and scuffing shall be spray
<br /> buffed. The floor shall be dust mopped after being spray buffed. After spray buffing, the area shall have a
<br /> uniform glossy appearance, free of scuffmarks, heel marks, and scratches. All spray buff solution shall be
<br /> removed from baseboards, furniture, trash receptacles, etc.
<br /> C. Wax and Buff Vinyl Tile Floors — Monthly (Public Works, Police Service Building, Marina Community
<br /> Center, Water Pollution Control Plant, 2 Recreation buildings, San Leandro Family Aquatic Center[during open
<br /> season only], Boys & Girls Club) and Quarterly (City Hall, dance floor at Marina Community Center, and Main
<br /> Library, including dance floor)
<br /> Prior to being waxed and buffed, the tile floor area shall be swept, vacuumed and completely wet-mopped. The
<br /> floor shall be evenly coated with wax to within 2 inches of the walls; a single disc floor machine shall be used to
<br /> restore a uniform gloss and protective finish to the floors, which are coated with metal-link polymer floor finish.
<br /> The floor finish shall be the same type as that already on the floor.
<br /> The floor shall be dust-mopped after being buffed. After waxing and buffing, the area shall have a uniform
<br /> glossy appearance, free of scuff marks, heel marks, and scratches. All wax shall be removed from baseboards,
<br /> furniture, trash receptacles, etc.
<br /> D. Dusting of Library Collections — Per Occurrence
<br /> Dusting of all book tops, videos, compact discs, displayed literature and bookshelves at all library locations.
<br /> E. Provide Day Porter- Daily (See Day Porter Specifications, beginning page 32)
<br /> The porter is primarily assigned to the PSB building and City Hall. Day Porters are anticipated for an 8-hour
<br /> shift/day on week days, and a 4-hour shift (jail only) on weekends.
<br /> J. Stripping and Refinishing VCT and Linoleum Floors —As specified in Attachment A for each building
<br /> Stripping is the complete removal, without damage to the floor surface, of all finish and/or sealer from all visible
<br /> floor surfaces and from those floor surfaces which can be exposed by the removal of non-fixed furnishings,
<br /> baseboards, door bottoms, etc. Stripping also includes the complete removal of all marks, scuffs, stains, etc,
<br /> except in cases in which there is damage to the floor surfaces. Where stripping chemicals are used, the areas
<br /> shall be rinsed to completely remove any traces of the solution. The pH of the floor surface shall be brought to
<br /> neutral (pH of 7) after stripping by rinsing with a mild acid base detergent. Stripping solution shall be wiped off
<br /> immediately from baseboards and other fixed items in the area. During the stripping process, care shall be
<br /> taken to avoid flooding of the floor with either the stripping solution or the rinse so as to prevent damage to the
<br /> tile and its bond to the sub-floor. Prior to and after the service, all furniture shall be moved as necessary. The
<br /> job shall not be considered complete until furniture is returned to its original location.
<br /> To refinish the floors after the floor has been stripped, two coats of sealer shall be applied. Then at least two
<br /> coats of metal interlock polymer floor finish shall be applied. Only every other coat shall be applied all the way
<br /> to the baseboard. The alternating coat shall be applied so as to leave a 12" border around the area. The coats
<br /> shall be thin and evenly applied. After the finish has dried, the reflectance shall be uniform and no streaks,
<br /> swirls, etc., shall be visible. No finish shall be left on the baseboards or other fixed equipment in the area. Each
<br /> coat of sealer or wax shall be buffed and dust-mopped thoroughly before the next coat is applied. Prior to and
<br /> after the service all furniture shall be moved as necessary. The job shall not be considered complete until
<br /> furniture is returned to its original location.
<br /> K. Windows - As specified in Attachment A for each building
<br /> Clean all interior windows and frames. Clean all exterior windows and frames. Windows shall be free of
<br /> smudges, fingerprints, cobwebs, etc.
<br /> Exhibit A— Page 40 of 42
<br />
|