My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2017 1204
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1204
>
8D Consent Calendar 2017 1204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2017 11:07:17 AM
Creation date
11/29/2017 11:07:16 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/4/2017
Retention
PERM
Document Relationships
Reso 2017-168
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-655 <br />·The project was described on the Engineering and Transportation Department website. <br />·Prior to construction, staff notified residents residing on the streets included in the project of <br />the project schedule. The contractor also provided English, Spanish, and Chinese <br />notifications to properties adjacent to the work via door hangers immediately before the work <br />started. <br />Fiscal Impacts <br />The total cost of the Annual Street Sealing 2016-17 Project, was $1,007,000, which included <br />design, construction management, inspection, and construction of the improvements. <br />A summary of the construction contract with American Pavement Systems, Inc. is listed below: <br />Original Contract: $ 730,000 <br />Change Orders:$ 165,000 <br />Total Contract Amount:$ 895,000 <br />The total project cost, including Curb Ramp Upgrade work was $1,467,000. <br />Budget Authority <br />Account No. Source FY/Approp Date.Amount <br />143-38-381 Vehicle registration Fees, FY16-17 $ 425,000 <br />Street Sealing <br />144-38-381 Measure B Fund, Street FY 16-17 $1,075,000 <br />Sealing <br />150-36-013 TDA, Annual Sidewalk FY 16-17 $ 76,556 <br />Repair <br />150-38-376 CalRecycle Grant 15-16 FY 15-16 $ 21,278 <br />Total $1,597,834 <br />Attachment(s) to Staff Report <br />·Annual Street Sealing 2016-17 Project - Photos <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 3 City of San Leandro Printed on 11/28/2017 <br />177
The URL can be used to link to this page
Your browser does not support the video tag.