My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8C Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:14 AM
Creation date
12/13/2017 11:32:12 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ID Engineer Task Name <br />1 AO Bicycle Network West <br />5 AO WPCP Dirt Offhaul Phase 1 <br />9 Dev Boat Harbor Decommission <br />14 DH East 14th / 144th Pedestrian Signal <br />19 DH East 14th / Joaquin Signal <br />Improvements <br />24 IL Annual Overlay/Rehab 16‐17 Group 2 <br />28 IL Street Overlay Rehab 17‐18 <br />33 IL Annual Overlay / Rehab 16‐17 Group 1 <br />36 IL Street Overlay Rehab 18‐19 <br />41 IL Street Overlay Rehab 19‐20 <br />46 IT Downton Wifi Expansion <br />47 IT Public Park Wifi <br />48 IT Public Park Wifi Phase 2 <br />49 JOD Bancroft Sybil Signal <br />52 JOD Fiber Conduit for Broadband Phase 2 <br />53 JOD Ramps for cape streets 16‐17 <br />54 JOD Annual Street Sealing 16‐17 <br />55 JOD Neptune Drive Shoreline Flood <br />Protection <br />61 JOD Marina Mulford Library <br />66 JOD Street Sealing 17‐18 <br />71 JOD Washington / Chapman RR crossing <br />75 JOD Street Sealing 18‐19 <br />80 JOD Dutton Ave SS upsize 1 and 2 <br />85 JOD Sybil Ave SS diversion, Marina Blvd SS <br />diversion, Peralta Ave SS upsize <br />90 JOD Chabot Park Playground and <br />Amphitheater <br />95 KKL East 14th St Triangle <br />100 KKL MacArthur Blvd Round About <br />104 KKL Police Building and South Office TI <br />work <br />108 KKL Police Department Range Upgrade <br />112 KKL Casa Peralta Security <br />113 KKL Casa Peralta Roof <br />114 KKL Casa Peralta Improvements <br />118 KKL Eden Road <br />122 MG Main Library and MCC AV Equip <br />126 MG WPCP AC repacement <br />130 MG Heron Bay Levee Maint <br />134 MG Farrelly Pool Replacement <br />139 MG Manor Park Competition Pool <br />144 MG SS point repair 2019 <br />148 MG ADA Transition Plan 2018 <br />153 MG Doolittle Drive Streetscape <br />Davis‐Fairway <br />158 MG Floresta Monterey Traffic Signal <br />163 MG Storm Drain Video Inspection <br />167 MG Downtown Park Construction <br />173 NNC East 14th St UG utility <br />177 NNC SS point repair 2017 <br />181 NNC Boys and Girls Club Pool Resurface <br />185 NNC Pedestrian Crossing Improvements <br />16‐17 <br />189 NNC Davis Carpentier Ped Signal <br />193 NNC Davis St San Sewer Manhole & Pipe <br />Rehab + SE line Rehab <br />198 NNC Pedestrian Crossing Improvements <br />17‐18 <br />203 NNC East 14th Pedestrian Lighting North <br />208 NNC Storm Water Trash Capture Phase 3 <br />213 NNC Pedestrian Crossing Improvements <br />18‐19 <br />218 NNC Washington Ave Reconstruction <br />223 NT Lake Chabot Stabilization Design <br />226 PT Marina Blvd Streetscape concepts <br />227 PW Warden Park Renovation <br />228 PW WPCP Roof Replacement <br />Bicycle Network West <br />WPCP Dirt Offhaul Phase 1 <br />Boat Harbor Decommission <br />/ <br />East 14th / Joaquin Signal Improvements <br />Annual Overlay/Rehab 16‐17 Group 2 <br />Street Overlay Rehab 17‐18 <br />Annual Overlay / Rehab 16‐17 Group 1 <br />Street Overlay Rehab 18‐19 <br />Street Overlay Rehab 19‐20 <br />Downton Wifi Expansion <br />Public Park Wifi <br />Public Park Wifi Phase 2 <br />Bancroft Sybil Signal <br />Fiber Conduit for Broadband Phase 2 <br />Ramps for cape streets 16‐17 <br />Annual Street Sealing 16‐17 <br />Neptune Drive Shoreline Flood Protection <br />Marina Mulford Library <br />Street Sealing 17‐18 <br />Washington / Chapman RR crossing <br />Street Sealing 18‐19 <br />Dutton Ave SS upsize 1 and 2 <br />Sybil Ave SS diversion, Marina Blvd SS diversion, Peralta Ave SS upsiz <br />Chabot Park Playgrou <br />East 14th St Tr <br />MacArthur Blvd Round About <br />Police Building and South Office TI work <br />Police Department Range Upgrade <br />Casa Peralta Security <br />Casa Peralta Roof <br />Casa Peralta Improvements <br />Eden Road <br />Main Library and MCC AV Equip <br />WPCP AC repacement <br />Heron Bay Levee Maint <br />Farrelly Pool Replacement <br />Manor Park Competition Pool <br />SS point repair 2019 <br />ADA Transition Plan 2018 <br />Doolittle Drive Streetscap <br />Floresta Monterey Traffic Signal <br />Storm Drain Video Inspection <br />Dow <br />East 14th St UG utility <br />SS point repair 2017 <br />Boys and Girls Club Pool Resurface <br />Pedestrian Crossing Improvements 16‐17 <br />Davis Carpentier Ped Signal <br />Davis St San Sewer Manhole & Pipe Rehab + SE line Rehab <br />Pedestrian Crossing Improvements 17‐18 <br />East 14th Pedestrian Lighting North <br />Storm Water Trash Capture Phase 3 <br />Pedestrian Crossing Improvements 18‐19 <br />Washington Ave Reconstruction <br />Lake Chabot Stabilization Design <br />Marina Blvd Streetscape concepts <br />Warden Park Renovation <br />WPCP Roof Replacement <br />Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 <br />2018 2019 2020 2021 2022 2023 <br /> Engineering look ahead.mpp Mon 8/14/17 <br />46
The URL can be used to link to this page
Your browser does not support the video tag.