Laserfiche WebLink
Annual Street Overlay/Rehabilitation <br />Projects 2017 -$6.04M <br />PHASE 1 - CONSTRUCTION BEGAN IN OCTOBOR, 2017. <br />Start Location End Location Costs <br />1 Estabrook Street East 14th Street Washington Avenue $324.2K <br />2 Fairbanks Street Barrow Street Sitka Street $101.1K <br />3 Longview Drive Astor Drive Skyview Drive $197.5K <br />4 O'Donnell Avenue Reynolds Street Grover Cleveland Park $190.5K <br />5 San Leandro Boulevard North City Limits San Leandro Creek $1,446.8K <br />6 Teagarden Street Alvarado Street 1000' w/o Alvarado $375.1K <br />PHASE 2 - CONSTRUCTION IN SPRING, 2018 <br />Start Location End Location Costs <br />1 Arena Street Laverne Avenue Elvina Drive $207.7K <br />2 Belleau Street Marne Street Maureen Street $350.7K <br />3 Del Mar Circle Portola Drive Cul de Sac $59.9K <br />4 Hesperian Boulevard Thornally Drive CV Freeway $1,896.1K <br />5 Marne Street Breckenridge Street Belleau Street $57.2K <br />6 Vining Drive Farnsworth Street Cranbrook Street $384.0K <br />Start Location End Location Costs <br />1 Arena Street Mendocino Street Laverne Drive $149.8K <br />2 Kappa Avenue Laverne Drive Elvina Drive $299.4K <br />Street Name <br />Reconstruction Streets <br />Street Name <br />Mill and Fill Streets <br />Street Name <br />Mill and Fill Streets <br />115