My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8L Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:49 AM
Creation date
12/13/2017 11:32:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-175
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-715 <br />requirements. <br />ACCO Engineered Systems (an employee-owned company with a local office in San Leandro) <br />was selected from the NJPA’s pool of qualified contractors and provided a detailed cost proposal <br />using Gordian’s ezIQC tool. ACCO provided a cost proposal for the project that includes a <br />detailed list of tasks, unit prices and quantities, which is attached to the agreement as Exhibit B. <br />Analysis <br />ACCO Engineered Systems walked the site with the Building Maintenance Supervisor and <br />developed the statement of work, which is attached to the agreement as Exhibit A. ACCO <br />Engineered Systems submitted its cost proposal in accordance with the ezIQC contract in the <br />amount of $228,912.56. Cost reasonableness for the project is achieved through the fair market <br />value of the construction goods and services established in the Construction Task Catalogue, <br />which prices over 275,000 construction work tasks, based on local material, equipment and labor <br />prices. ACCO Engineered Systems has competitively bid an adjustment factor to the <br />pre-established unit prices, so the City is assured a competitive price for each element of the <br />project Scope of Work. The procurement method will facilitate timely replacement of the boilers <br />which are essential to proper heating at the Main Library. <br />Fiscal Impacts and Budget Authority <br />This Facilities Maintenance Fund project will cost $228,912.56 and will be charged to account <br />687-18-007-5242. The City Hall paint exterior project scheduled for 2017-18 (carryover from <br />2016-17) will be rescheduled to 2018-19 to fund this emergent boiler replacement for the Main <br />Library. <br />ATTACHMENT <br />Attachment to Related Legislative File <br />·Non-Professional Services Agreement between the City of San Leandro and ACCO <br />Engineered Systems for Main Library Boiler Replacement Project <br />PREPARED BY: Jennifer Auletta, Deputy Public Works Director <br />Page 2 City of San Leandro Printed on 12/12/2017 <br />226
The URL can be used to link to this page
Your browser does not support the video tag.