Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:049724.00 <br />San Leandro Library Boiler <br />Category - No Category Input <br />01 22 20 00 0058 System Testing Engineer7 $8,166.30HR <br />Installation =x x 8,166.30FactorUnit PriceQuantity Total <br /> 152.22 1.3412 40.00 <br />Permit office / building inspector coordination, trade coordination meetings, red line drawings review. <br />01 22 20 00 0058 System Testing Engineer8 $4,899.78HR <br />Installation =x x 4,899.78 <br />FactorUnit PriceQuantity Total <br /> 152.22 1.3412 24.00 <br />Factory Start up Personnel for boiler commissioning <br />01 22 23 00 0654 20 To 25 Ton Lift Hydraulic Crane With Full-Time Operator9 $1,702.96DAY <br />Installation =x x 1,702.96 <br />FactorUnit PriceQuantity Total <br /> 1,269.73 1.3412 1.00 <br />01 22 23 00 0733 8,000 LB Straight Mast, Industrial Warehouse Forklift With Full-Time Operator10 $2,422.02DAY <br />Installation =x x 2,422.02 <br />FactorUnit PriceQuantity Total <br /> 902.93 1.3412 2.00 <br />Equipment Receiving, unloading, storage in secured indoor location and loading. <br />01 22 23 00 0922 3 Ton, 4 x 2 Flat Bed Truck With Full-Time Truck Driver11 $2,617.38DAY <br />Installation =x x 2,617.38FactorUnit PriceQuantity Total <br /> 975.76 1.3412 2.00 <br />This will be used to transport the new and old boiler from ACCO's warehouse to the jobsite. ACCO will <br />remove and dispose of the piping and existing boiler with a certified recycling company upon completion <br />01 66 19 00 0002 Moving Material Via Stairs, Per CY Of Material Per FloorQuantity equals <br />material volume times number of floors traveled. <br />12 $399.14CY <br />Installation =x x 399.14 <br />FactorUnit PriceQuantity Total <br /> 7.44 1.3412 40.00 <br />ACCO will remove and dispose of the piping and existing boiler with a certified recycling company upon <br />completion <br />01 71 13 00 0008 20 To 30 Ton Lift Move On/Off Cost, Truck Mounted CraneIncludes delivery <br />and pickup. <br />13 $502.92EA <br />Installation =x x 502.92FactorUnit PriceQuantity Total <br /> 374.98 1.3412 1.00 <br />01 74 19 00 0017 40 CY Dumpster "Construction Debris"Includes delivery of dumpster, rental <br />cost, pick-up cost, hauling, and disposal fee. Non-hazardous material. <br />14 $596.82EA <br />Installation =x x 596.82FactorUnit PriceQuantity Total <br /> 444.99 1.3412 1.00 <br />05 05 23 00 0104 3/8" Diameter x 3" Length, 304/18-8 Stainless Steel, Wedge Anchor <br />Expansion Bolt <br />15 $213.30EA <br />Installation =x x 213.30 <br />FactorUnit PriceQuantity Total <br /> 9.94 1.3412 16.00 <br />Used to anchor boilers, expansion tank and pot feeder. <br />22 07 19 00 0051 3" Diameter Pipe, 2" Thick Fiberglass Insulation16 $1,491.08LF <br />Installation =x x 1,314.71FactorUnit PriceQuantity Total <br /> 13.07 1.3412 75.00 <br />Demolition x x = 176.37 2.63 1.3412 50.00 <br />Insulation as required by T24 <br />22 07 19 00 0051 0028 For Work In Restricted Working Space, Add17 $143.51MOD <br />Installation =x x 143.51FactorUnit PriceQuantity Total <br /> 2.14 1.3412 50.00 <br />Page 2 of 8 <br />8/15/2017 <br />Contractor's Price Proposal - Detail <br />254