My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8L Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:49 AM
Creation date
12/13/2017 11:32:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-175
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:049724.00 <br />San Leandro Library Boiler <br />Category - No Category Input <br />23 05 93 00 0044 >500 To 1000 MBH, Water Balance, Boiler30 $2,230.76EA <br />Installation =x x 2,230.76FactorUnit PriceQuantity Total <br /> 831.63 1.3412 2.00 <br />water balance to ensure design flow through each boiler <br />23 09 23 00 0049 Install And Wire Boiler Controls For Enable And Alarm31 $649.38EA <br />Installation =x x 649.38 <br />FactorUnit PriceQuantity Total <br /> 242.09 1.3412 2.00 <br />Controls are shipped loose and require field installation <br />23 09 23 00 0050 Install And Wire Boiler SafetiesFor high water, low water and flame <br />safeguard. <br />32 $649.38EA <br />Installation =x x 649.38 <br />FactorUnit PriceQuantity Total <br /> 242.09 1.3412 2.00 <br />Safeties are shipped loos and require field installation. <br />23 09 23 00 0240 Boiler Optimization Program33 $11,024.53EA <br />Installation =x x 11,024.53FactorUnit PriceQuantity Total <br /> 4,109.95 1.3412 2.00 <br />The newly installed boilers will be optimized to operate efficiently to allow for future energy savings and <br />improved operating efficiency <br />23 21 13 23 0007 1-1/2" Schedule 40 Threaded Black Steel Pipe With 150 LB Malleable Iron <br />Fitting AssemblyIncludes all hangers and all fittings (couplings, elbows, tees <br />and reducer fittings). All hangers are complete assemblies. Not for use where <br />detail is available. <br />34 $637.74LF <br />Installation =x x 502.95 <br />FactorUnit PriceQuantity Total <br /> 15.00 1.3412 25.00 <br />Demolition x x = 134.79 4.02 1.3412 25.00 <br />23 21 13 23 1087 3" Black Schedule 40 Grooved Pipe35 $3,127.68LF <br />Installation =x x 2,143.24FactorUnit PriceQuantity Total <br /> 31.96 1.3412 50.00 <br />Demolition x x = 984.44 14.68 1.3412 50.00 <br />23 21 13 23 1150 3" 90 Degree Elbow, Ductile Iron, Grooved36 $1,091.84EA <br />Installation =x x 852.57 <br />FactorUnit PriceQuantity Total <br /> 79.46 1.3412 8.00 <br />Demolition x x = 239.27 22.30 1.3412 8.00 <br />23 21 13 23 1479 3" x 2-1/2" Eccentric Reducer, Grooved37 $285.46EA <br />Installation =x x 285.46 <br />FactorUnit PriceQuantity Total <br /> 106.42 1.3412 2.00 <br />23 21 13 23 1639 3" Butterfly Valve, Grooved, With Standard Trim38 $1,617.65EA <br />Installation =x x 1,617.65FactorUnit PriceQuantity Total <br /> 301.53 1.3412 4.00 <br />ISO Valves for main loops <br />23 21 13 23 1699 Cut 3-1/2" Groove39 $356.22EA <br />Installation =x x 356.22 <br />FactorUnit PriceQuantity Total <br /> 13.28 1.3412 20.00 <br />groove cutting <br />23 21 13 23 1738 3" Grooved Standard Gasket, EPDM "E" Or Nitrile "T"40 $752.95EA <br />Installation =x x 752.95 <br />FactorUnit PriceQuantity Total <br /> 28.07 1.3412 20.00 <br />Page 4 of 8 <br />8/15/2017 <br />Contractor's Price Proposal - Detail <br />256
The URL can be used to link to this page
Your browser does not support the video tag.