Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Title: <br />Work Order Number:049724.00 <br />San Leandro Library Boiler <br />Category - No Category Input <br />26 24 16 00 0445 2 Pole, 120/240 Volt, 15-30 A, Branch Circuit Breaker, 22,000 Amp <br />Interrupting Capacity <br />75 $211.55EA <br />Installation =x x 211.55FactorUnit PriceQuantity Total <br /> 157.73 1.3412 1.00 <br />28 31 23 00 0105 Control Relay UIO (Plug In) Module (EST3 SIGA-MCR)76 $128.74EA <br />Installation =x x 128.74FactorUnit PriceQuantity Total <br /> 95.99 1.3412 1.00 <br />40 05 13 19 0034 3/4" Stainless Steel Tubing, Type 304, 0.065" Wall77 $785.27LF <br />Installation =x x 596.16FactorUnit PriceQuantity Total <br /> 17.78 1.3412 25.00 <br />Demolition x x = 189.11 5.64 1.3412 25.00 <br />Inlet to condensate neutralizer <br />40 05 13 19 0343 10" 90 Degree Elbow, Stainless Steel Schedule 5 Type 30478 $2,037.85EA <br />Installation =x x 2,037.85FactorUnit PriceQuantity Total <br /> 1,519.42 1.3412 1.00 <br />$228,912.56Subtotal for Category - No Category Input <br />Proposal Total <br />This total represents the correct total for the proposal. Any discrepancy between line totals, <br />sub-totals and the proposal total is due to rounding. <br />$228,912.56 <br />Page 8 of 8 <br />8/15/2017 <br />Contractor's Price Proposal - Detail <br />260