My WebLink
|
Help
|
About
|
Sign Out
Home
8N Consent Calendar 2017 1218 01
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8N Consent Calendar 2017 1218 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:52 AM
Creation date
12/13/2017 11:32:52 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-177
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-657 <br />A summary of the construction contract with Silman Construction, Inc. is listed below: <br />Original Contract: $ 433,518 <br />Change Orders: $ - 21,731 <br />Total Contract Amount: $ 411,787 <br />The total project cost, including the Annual Street Sealing 2016-17 work was $1,467,000. <br />Budget Authority <br />Account No. Source FY/Approp Date.Amount <br />143-38-381 Vehicle registration Fees, FY16-17 $ 425,000 <br />Street Sealing <br />144-38-381 Measure B Fund, Street FY 16-17 $1,075,000 <br />Sealing <br />150-36-013 TDA, Annual Sidewalk FY 16-17 $ 76,556 <br />Repair <br />150-38-376 CalRecycle Grant 15-16 FY 15-16 $ 21,278 <br />Total $1,597,834 <br />Attachment(s) to Staff Report <br />·Curb ramp Upgrades 2016-17 Project - Photos <br />PREPARED BY: John O’Driscoll, Associate Engineer, Engineering and Transportation <br />Department <br />Page 3 City of San Leandro Printed on 12/12/2017 <br />338
The URL can be used to link to this page
Your browser does not support the video tag.