My WebLink
|
Help
|
About
|
Sign Out
Home
8O Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8O Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:59 AM
Creation date
12/13/2017 11:32:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-178
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CONDITIONS OF APPROVAL <br />PLN17-0003 <br />100 Halcyon Drive <br />100 Halcyon Owners, LLC (Applicant and Property Owner) <br />I.COMPLIANCE WITH APPROVED PLANS <br />A. The project shall comply with Exhibits A through VV, attached to the staff report, dated <br />August 3, 2017, except as hereinafter modified. (Exhibits are on file at the City of San <br />Leandro, Community Development Department, 835 East 14th Street, San Leandro, <br />California, 94577). <br />Exhibit A - Site Plan, Zoning Map (Sheet A0.0) <br />Exhibit B - Site Plan (Sheet A1.0) <br />Exhibit C -Alternative Site Plan (Sheet AB-A2.1) <br />Exhibit D - Building 1 Site Plan (Sheet 1-A1.0 ALT) <br />Exhibit E - Building 1 Floor Plan (Sheet 1-A2.1) <br />Exhibit F - Building 1 Roof Plan (Sheet 1-A2.10) <br />Exhibit G - Building 1 Elevations (Sheet 1-A3.1) <br />Exhibit H -Building 1 Alternative for Cell Tower(Sheet 1-A3.2), as per IV. H. below. <br />Exhibit I - Building 2 Site Plan (Sheet 2-A1.1) <br />Exhibit J - Building 2 Floor Plan (Sheet 2-A2.1) <br />Exhibit K - Building 2 Roof Plan (Sheet 2-A2.10) <br />Exhibit L - Building 2 Elevations (Sheet 2-A3.1) <br />Exhibit M - Building 3 Site Plan (Sheet 3-A1.1) <br />Exhibit N -Building 3 Floor Plan (Sheet 3-A2.1) <br />Exhibit O - Building 3 Roof Plan (Sheet 3-A2.10) <br />Exhibit P - Building 3 Elevations (Sheet 3-A3.1) <br />Exhibit Q - Line of Sight Study(Sheet DAB-A4.1) <br />Exhibit R- Landscape Plan (Sheet LCI) <br />Exhibit S - Topographic Survey(Sheet C1) <br />Exhibit T - Civil Engineer Site Plan (Sheet C2) <br />Exhibit U - Civil Details (Sheet C3) <br />Exhibit V - Sections (Sheet C4) <br />Exhibit W - Sections (Sheet C4.1) <br />Exhibit X - Grading and Drainage (Sheet C5) <br />Exhibit Y - Utility Plan (Sheet C6) <br />Exhibit Z - Storm Water Quality Control Plan (Sheet C7) <br />Exhibit AA - Right Turn Pocket Exhibit(EX 1) <br />Exhibit BB - Colored Rendering Building 1 <br />Exhibit CC - Colored Rendering Building 2 <br />Exhibit DD - Colored Elevations <br />Exhibit EE - Photometric Plan (Sheet P-SL-2) <br />Exhibit FF - Colors and Materials Board <br />Exhibit GG - Distant Views of Murals on Elevations <br />Exhibit HH - Indigenous People/Fall Image-Mural <br />Exhibit II - Industrial Age (wrench)/Winter Image-Mural <br />Agreement to Conditions August 3,2017 <br />PLN17-0003 Page 4 of 19 <br />349
The URL can be used to link to this page
Your browser does not support the video tag.