My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2017246911
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2017
>
Inst 2017246911
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 12:55:59 PM
Creation date
12/13/2017 12:55:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
11/8/2017
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Construction workers on the project shall be provided clean drinking water,portable toilets <br /> and handwashing stations as sanitary facilities for use during all phases of construction.Said <br /> portable toilets shall be screened from view from the public right-of-way or located to the <br /> interior or rear of the site. <br /> IV. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br /> A. Analysis needs to be completed to ensure that the fire protection system does not need a <br /> Fire Pump for the Fire Protection System to maintain adequate flow. Said analysis shall <br /> be performed and determined prior to application for a building permit. <br /> B. Permits will be required for the modifications to the fire protection system and relocation <br /> of fire hydrants. <br /> C. Analysis needs to be completed to ensure exiting is compliant. <br /> D. Fire Lanes shall be marked and maintained at all times. <br /> E. At no time can parking (Vehicle staging after service) be allowed outside the on the <br /> tarmac on the East side of the maintenance facility. <br /> F. Fire Extinguisher 4A 40B:C shall be provided with a travel distance that does not exceed <br /> 75 feet. <br /> G. Emergency lighting and Exit signs shall be provided throughout the facility. <br /> H. An additional Hydrant maybe required inside the fenced area on the Northside of the <br /> building. This will be evaluated during the Building Permit process. <br /> V. BUILDING& SAFETY SERVICES REQUIREMENTS <br /> A. Code Compliance for Call Green is required and must be incorporated onto building <br /> permit plans. <br /> B. Complete Energy calculation is required and must be incorporated onto building permit <br /> plans. <br /> VI. ENGINEERING AND TRANSPORTATION REQUIREMENTS <br /> A. Storm Drain Conditions: <br /> 1) The Applicant shall reduce storm water pollution by implementing the following <br /> pollution source control measures: <br /> a) Structures shall be designed to discourage the occurrence and entry of pests into <br /> buildings,thus minimizing the need for pesticides. The trash area shall be <br /> separated from the rest of the building by concrete or masonry walls so that pests <br /> that gain access to the area are less likely to access the rest of the building. <br /> Agreement to Conditions October 5,2017 <br /> PLN 17-0007 Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.