My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2017 George Salinas Tree Preservation for Boulevard Sycamore Tree 3294
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2017
>
Agmt 2017 George Salinas Tree Preservation for Boulevard Sycamore Tree 3294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 4:45:18 PM
Creation date
12/14/2017 4:43:23 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/20/2017
Retention
PERM
Document Relationships
Reso 2017-163
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. WEEKLY MEETINGS: Contractor shall be required to meet weekly with the Street Supervisor or his <br /> representative to confirm the work completed,discuss any issues that may have occurred, and to <br /> review the contractor's proposed work schedule. <br /> 10.CLEANUP:All branches, brush, leaves, chips, and sawdust are to be removed from the site and <br /> properly disposed of by the Contractor as part of the bid price. The intent is that all areas are to be left <br /> in as clean a condition or better than before the Contractor's operations. Cleanup is to be done <br /> continuously as each tree is finished. No brush is to be left at any of the tree sites. <br /> 11.TRAFFIC CONTROL AND ACCESS: Contractor shall not completely obstruct public pedestrian <br /> pathways or deny access to private property at any time. No streets shall be closed at any time.The <br /> Contractor may establish "No Parking"zones, contiguous to the work area by posting signs.The City <br /> will enforce parking restrictions only when the Contractor has posted the proper signs and has <br /> notified the City Police Department a minimum of 48 hours in advance of the required restriction <br /> period. <br /> Construction signs, lights, barricades, etc., shall conform to the latest revision of the Manual of <br /> Warning Signs, Lights and Devices for Use in Performance of Work Upon Highways, by California <br /> Department of Transportation. <br /> 12.CORRECTION OF HAZARDOUS CONDITIONS: If, in the determination of the city Supervisor, any <br /> work done or omitted by the Contractor or any act of vandalism or theft has created a condition <br /> hazardous to the public, the city Supervisor will notify the Contractor's office by telephone. The <br /> Contractor shall commence correction of such condition by placement of barricades or as otherwise <br /> directed by the city within one(1)hour of receipt of such notice at his office, and shall complete <br /> correction thereof on the same calendar day, regardless of the size of the working force required or <br /> the number of hours of work required. <br /> If the contractor cannot be reached by telephone, or fails to respond to the hazardous condition within <br /> the specified one(1)hour limit,the city shall have the authority to cause said hazardous condition to <br /> be corrected and deduct the cost thereof from any amounts due or to become due the Contractor. <br /> Such costs shall include any minimum or base costs for labor, materials or equipment as required by <br /> contracts, agreements or supplier but in no case shall such cost be less than$250 per hazardous <br /> condition per location. <br /> Non-Professional Services Agreement between City of San Leandro and November 6, 2017 <br /> George Salinas Tree Preservation Exhibit A—Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.