Laserfiche WebLink
2.8 Authorization to Perform Services. The Contractor is not authorized to perform any <br /> services or incur any costs whatsoever under the terms of this Agreement until receipt of <br /> authorization from the Contract Administrator. <br /> 2.9 Liquidated Damages. Failure of Contractor to respond to problems referred to it by City <br /> within the time limits established in Subsection 1.2 of this Agreement shall result in <br /> liquidated damages as set forth in Exhibit A. <br /> Section 3. FACILITIES AND EQUIPMENT. Contractor shall, at its sole cost and expense, provide all <br /> facilities and equipment that may be necessary to perform the services required by this Agreement. <br /> 3.1 Safety Requirements. In accordance with generally accepted construction practices and <br /> state law, Contractor shall be solely and completely responsible for conditions on the <br /> jobsite, including safety of all persons and property during performance of the work. This <br /> requirement shall apply continuously and not be limited to normal working hours. <br /> Contractor shall take all necessary precautions and provide all necessary safeguards to <br /> prevent personal injury and property damage. Contractor shall provide protection for all <br /> persons including, but not limited to, its employees and employees of its subcontractors; <br /> members of the public; and employees, agents, and representatives of the City and <br /> regulatory agencies that may be on or about the work. <br /> The services of the City in conducting review and inspection of Contractor's performance is <br /> not intended to include review of the adequacy of Contractor's work methods,equipment, <br /> bracing or scaffolding, or safety measures, in,on, or near any Contractor jobsite. <br /> All work and materials shall be in strict accordance with all applicable state,city, county, <br /> and federal rules, regulations and codes, with specific attention to the United States <br /> Department of Labor Occupational Health and Safety Administration (OSHA) <br /> requirements. Contractor shall be solely responsible for compliance with all city, county, <br /> and state explosive transport,storage, and blasting requirements and for any damages <br /> caused by such operations. <br /> Contractor is hereby informed that work on City property could be hazardous. Contractor <br /> shall carefully instruct all personnel working on City property that all conditions of the <br /> property are potentially hazardous work areas as to potential dangers and shall provide <br /> such necessary safety equipment and instructions as are necessary to prevent injury to <br /> personnel and damage to property. Special care shall be exercised relative to work <br /> underground. <br /> In addition to complying with all other safety regulations, Contractor shall abide by any and <br /> all other City requirements contained in any specifications,special conditions or manuals, <br /> which shall be made available by City upon request. <br /> Contractor shall provide and maintain all necessary safety equipment such as fences, <br /> barriers, signs, lights,walkways, guards, and fire prevention and fire-fighting equipment <br /> Non-Professional Services Agreement between City of San Leandro and 11/6/2017 <br /> George Salinas Tree Preservation for Boulevard Yarwood Sycamore Tree Trimming Page 4 of 15 <br />