My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2018 0220
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0220
>
5A Public Hearings 2018 0220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 1:44:49 PM
Creation date
2/14/2018 1:44:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/20/2018
Retention
PERM
Document Relationships
Reso 2018-008
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1018
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Area is almost entirely built out with retail and residential uses and is relatively flat with elevations <br />ranging from 35 to 45 feet above mean sea level. <br />3.3 Cumulative Development <br />CEQA defines cumulative impacts as two or more individual actions that, when considered together, <br />are considerable or will compound other environmental impacts. Cumulative impacts are the <br />changes in the environment that result from the incremental impact of development of the <br />proposed project and other nearby projects. For example, traffic impacts of two nearby projects <br />may be insignificant when analyzed separately, but could have a significant impact when analyzed <br />together. Cumulative impacts analysis provides a reasonable forecast of future environmental <br />conditions and can more accurately gauge the effects of a series of projects. <br />The Specific Plan Area is within the City of San Leandro. The cumulative impacts analysis for this EIR <br />is based on the City’s 2035 General Plan, adopted in September 2016 (and incorporated herein by <br />reference), and its Final Environmental Impact Report (certified in September 2016). The 2035 <br />General Plan plans for up to 5,370 new housing units (4,645 multi-family units and 725 single family <br />units) and a population increase of 14,790 by 2035. The 2035 General Plan accounts for TOD <br />development within the Specific Plan and the 2035 General Plan EIR assumed 1,100 new housing <br />units and 773 new jobs in the Specific Plan Area. Therefore, development under the Specific Plan <br />could exceed the growth projections assumed under the 2035 General Plan. Development under the <br />proposed Specific Plan in conjunction with development under the 2035 General Plan is accounted <br />for in the cumulative impacts analysis. <br />The Specific Plan Area is located geographically in the southeastern corner of San Leandro; however, <br />cumulative development as considered in this EIR is generally spread throughout San Leandro. Some <br />cumulative impacts are not necessarily significant in relation to development that occurs further <br />from the Specific Plan Area. For example, aesthetic and noise impacts associated with the Specific <br />Plan are not likely to be detected in the northern part of San Leandro, but may be detected in the <br />adjacent residential neighborhoods in southeastern San Leandro and in the Alameda County <br />unincorporated community of Ashland. Selected cumulative impact discussions, such as land use <br />and geology and soils, rely on a smaller geographic area: these are noted as appropriate. Some <br />cumulative impact discussions, such as air quality, rely on much larger geographic areas such as the <br />Bay Area region. These are noted as appropriate. Unless otherwise noted, cumulative development <br />includes all development within San Leandro anticipated by the 2035 General Plan. <br />119
The URL can be used to link to this page
Your browser does not support the video tag.