My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2018 0220
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0220
>
5A Public Hearings 2018 0220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 1:44:49 PM
Creation date
2/14/2018 1:44:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/20/2018
Retention
PERM
Document Relationships
Reso 2018-008
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1018
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Impact Mitigation Measure(s) Residual Impact <br /> All projects occurring within or adjacent to sensitive habitats that may support <br />federally and/or state listed endangered/threatened species shall have a CDFW- <br />and/or USFWS-approved biologist present during all initial ground <br />disturbing/vegetation clearing activities. Once initial ground <br />disturbing/vegetation clearing activities have been completed, said biologist shall <br />conduct daily pre-activity clearance surveys for endangered/threatened species. <br />Alternatively, and upon approval of the CDFW and/or USFWS, said biologist may <br />conduct site inspections at a minimum of once per week to ensure all prescribed <br />avoidance and minimization measures are fully implemented. <br /> No endangered/threatened species shall be captured and relocated without <br />express permission from the CDFW and/or USFWS. <br /> If at any time during construction of the project an endangered/threatened <br />species enters the construction site or otherwise may be impacted by the project, <br />all project activities shall cease. A CDFW/USFWS-approved biologist shall <br />document the occurrence and consult with the CDFW and USFWS, as <br />appropriate, to determine whether it was safe for project activities to resume. <br /> For all projects occurring in areas where endangered/ threatened species may be <br />present and are at risk of entering the project site during construction, exclusion <br />fencing shall be placed along the project boundaries prior to start of construction <br />(including staging and mobilization). The placement of the fence shall be at the <br />discretion of the CDFW/USFWS-approved biologist. This fence shall consist of <br />solid silt fencing placed at a minimum of 3 feet above grade and 2 feet below <br />grade and shall be attached to wooden stakes placed at intervals of not more <br />than 5 feet. The fence shall be inspected weekly and following rain events and <br />high wind events and shall be maintained in good working condition until all <br />construction activities are complete. <br /> All vehicle maintenance/fueling/staging shall occur not less than 100 feet from <br />any riparian habitat or water body . Suitable containment procedures shall be <br />implemented to prevent spills. A minimum of one spill kit shall be available at <br />each work location near riparian habitat or water bodies. <br /> No equipment shall be permitted to enter wetted portions of any affected <br />drainage channel. <br /> All equipment operating within streams shall be in good conditions and free of <br />leaks. Spill containment shall be installed under all equipment staged within <br />stream areas and extra spill containment and clean up materials shall be located <br />in close proximity for easy access . <br /> If project activities could degrade water quality, water quality sampling shall be <br />implemented to identify the pre-project baseline, and to monitor during <br />construction for comparison to the baseline. <br />72
The URL can be used to link to this page
Your browser does not support the video tag.